Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberFIR09-00581
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 350 S ALLUMBAUGH WAY
Project NameGrace @ Englefield Green
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of installing approximately 90' of 6" C900 underground.

(Grace @ Englefield Green - Assisted Living) Scope of work includes construction of a 66,772 sq. ft., single story, fully sprinklered, Type VA construction, divided by (4) 2-hour fire walls to create three buildings for allowable floor area compliance based on type of consturction (11, 857 sq. ft. / 43,167 sq. ft. / 11,698 sq. ft.); with 85 supervised residential units (34 one bedroom units @ 528 sq. ft.; 37 Studio Units @ 388 sq. ft.; 2 two bedroom units @ 816 sq. ft.; 2 two bedroom units @ 780 sq. ft. and 4 Friendship Units @ 366 sq. ft.); use of 2-hour fire walls and (4) 1-hour smoke barrier walls create (5) smoke compartments; 1-hour smoke partitions to create a smoke resistant corridor system; a kitchen, dining and socializing area; laundry, mechanical and common use support areas. There are four interior courts (3,536 sq. ft. / 2,911 sq. ft. / 4,492 sq. ft. / 3,536 sq. ft.) that exit back through the facility; installation of electrical, mechanical, plumbing, sprinkler and alarm systems; and all associated site work and landscaping, all per reviewed plans to include red-line review notes and all attached plan review conditions / comments as part of the reviewed plans. Carports ARE NOT a part of this permit. They will require separate submittals. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  1/14/2011 DONE
Sent to records for scanning.
INSP-Final Inspection6/2/20106/2/20106/2/2010PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Supply line flush2/8/20102/9/20102/10/2010PPASS
DetailsTroy Cobbley
The underground supply line flush passed.
INSP-Sprinkler Rough-in/Hydro10/23/200910/23/200910/23/2009PPASS
DetailsTroy Cobbley
The underground hydro test passed.
INSP-Sprinkler Rough-in10/5/200910/5/200910/5/2009PPASS
DetailsTroy Cobbley
The underground supply piping is ok to cover.
Issue and Print Permit  9/25/2009 DONE
Plan assigned to (Tim)9/22/2009 9/24/2009 DONE
DetailsTim Frost
9/24/2009 15:12:29 TRF - activity updated through activity FIRA22 from case FIR09-00581.
Sprinkler Plan Check9/24/2009 9/24/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  9/24/2009 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  9/24/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire9/24/2009 9/24/2009 DONE
Details
Telephone call  9/24/2009 DONE
Details
left message w rolain for jeff anderson at ###-#### - permit ready and fees given
Permit Ready to Issue  9/24/2009 DONE
Details
Application received  9/22/2009