Miscellaneous action | | | 3/16/2010 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 3/4/2010 | 3/5/2010 | 3/5/2010 | A | PASS |
Forrest France
|
|
|
Correction items verified for completion, as-built plan accepted, fire alarm permit finaled.
|
INSP-Final Inspection | 3/2/2010 | 3/3/2010 | 3/3/2010 | A | PART |
Forrest France
|
|
|
Correction items include relocate duct detector at RTU 302, provide correct sample tubes per mfg. cut sheets for respective duct widths at all 8 DD, post an updated map at the panel per review comments, provide a lock and label at the breaker to the new nac, provide as-builts for field modifications including added notification appliances for the new exam room 340, stair 302, and revised operations matrix for duct detectors programed as alarm, contractor to check sync module for discrepancy between circuts N1:1- N1:2 and N1:3. Remainder of the scope of work passed inspection.
|
FIR-Aging Inspection | 1/4/2010 | 1/4/2010 | 1/4/2010 | | DONE |
Forrest France
|
|
|
Site work in progress, construction underway.
|
Plan assigned to (Stephanie) | 9/30/2009 | | 10/1/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
10/1/2009 09:27:25 SLC - activity updated through activity FIRA24 from case FIR09-00588.
|
1st review completed | | | 10/1/2009 | | DONE |
|
|
|
|
Alarm Plan Check | 10/1/2009 | | 10/1/2009 | | PASS |
Stephanie L. Cobbley
|
|
|
See redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 10/1/2009 | | DONE |
|
|
|
Approved redlined plans available at front counter
|
Inspection Record Card- Fire | 10/1/2009 | | 10/1/2009 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 10/1/2009 | | DONE |
|
|
|
|
Telephone call | | | 10/1/2009 | | DONE |
|
|
|
Called Charlie permit ready and fee given
|
Issue and Print Permit | | | 10/1/2009 | | DONE |
|
|
|
|
Application received | | | 9/30/2009 | | |
|
|
|
|