Miscellaneous action | | | 3/8/2010 | | DONE |
|
|
|
Plans sent to scanning.
|
INSP-Final Inspection | 3/3/2010 | 3/4/2010 | 3/4/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Miscellaneous action | | | 1/27/2010 | | DONE |
Tim Frost
|
|
|
See letter dated 01-27-10
Apparently, the building has shelving at present up to 10'H, 30"D, 26" inbetween shelves and 2'-11 1/2" aisles storing records in cardboard boxes. This would be classified and OH2 under Miscellaneous Storage T13.2.1 NFPA 13, 2007.
The design that was submitted and approved is for future storage of racks, 16'H and 8' asiles of class IV storage. (records in cardboard boxes). Both designs will work based upon the submitted hydraulic calculations. The plans that were reviewed do NOT reflect the current conditions. The current condition information is described in the letter.
|
Case Summary | | | 1/25/2010 | | |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2009 | 11/23/2009 | 11/23/2009 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed and the branchline restraints have now been added.
|
INSP-Sprinkler Rough-in/Hydro | 11/19/2009 | 11/20/2009 | 11/20/2009 | A | PART |
Troy Cobbley
|
|
|
I finished the rough-in inspection in the previously locked tenant space. I started the above ground hydro test but Brian called me later and stated that he had lost pressure and we would need to reschedule.
|
INSP-Sprinkler Rough-in/Hydro | 11/19/2009 | 11/19/2009 | 11/19/2009 | P | PART |
Troy Cobbley
|
|
|
The basic rough-in is passed. Branchline restraints are missing and there was no access to one tenant space to inspect the new main. No hydro test was performed today.
|
INSP-Supply line flush | 11/12/2009 | 11/13/2009 | 11/13/2009 | A | PASS |
Troy Cobbley
|
|
|
The underground flush passed.
|
INSP-Supply line flush | 11/9/2009 | 11/9/2009 | 11/9/2009 | P | CANC |
Troy Cobbley
|
|
|
The underground flush is to be rescheduled per Brian.
|
INSP-Sprinkler Rough-in/Hydro | 11/9/2009 | 11/9/2009 | 11/9/2009 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed.
|
INSP-Sprinkler Rough-in | 11/5/2009 | 11/5/2009 | 11/5/2009 | P | PASS |
Troy Cobbley
|
|
|
The remaining underground supply piping is ok for cover.
|
INSP-Sprinkler Rough-in | 11/4/2009 | 11/4/2009 | 11/4/2009 | P | PART |
Troy Cobbley
|
|
|
See the city approved plans for the additional underground supply piping that is ok to cover.
|
INSP-Sprinkler Rough-in | 11/3/2009 | 11/4/2009 | 11/3/2009 | A | PART |
Troy Cobbley
|
|
|
The first 80'-0" feet fo 6" underground supply piping is ok to cover. The original stamped plans were not on site but will be tomorrow per Brian.
|
Plan assigned to (Tim) | 10/6/2009 | | 10/7/2009 | | DONE |
Tim Frost
|
|
|
10/7/2009 10:12:12 TRF - activity updated through activity FIRA22 from case FIR09-00600.
|
Sprinkler Plan Check | 10/7/2009 | | 10/7/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/7/2009 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 10/7/2009 | | 10/7/2009 | | DONE |
|
|
|
|
Telephone call | | | 10/7/2009 | | DONE |
|
|
|
t/c w damaris at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/7/2009 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/7/2009 | | DONE |
|
|
|
|
Application received | | | 10/6/2009 | | |
|
|
|
|
Pending Assignment by SAM | 10/6/2009 | | 10/6/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
10/6/2009 14:10:42 ALR - activity updated through activity FIRA158 from case FIR09-00600.
|