Miscellaneous action | | | 1/14/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 5/6/2010 | 5/7/2010 | 5/7/2010 | P | PASS |
Forrest France
|
|
|
Corrections field verified, fire sprinkler permit final approved.
|
INSP-Final Inspection | 5/4/2010 | 5/5/2010 | 5/5/2010 | P | FAIL |
Forrest France
|
|
|
Two pendent heads at the first floor living room are blocked by surface mounted ceiling obstructions, missing escutcheon at one sw head basement level, master bedroom 2nd pc. canopies need adjustment, delay at flow switch <5 sec.
|
INSP-Final Inspection | 4/1/2010 | 4/1/2010 | 4/1/2010 | P | PART |
Forrest France
|
|
|
Construction underway
|
INSP-Supply line flush | 1/27/2010 | 1/28/2010 | 2/1/2010 | P | PART |
Forrest France
|
|
|
Supply line flush okayed per site visit and activity notes 1/29.
|
INSP-Supply line flush | 1/28/2010 | 1/29/2010 | 1/29/2010 | A | PART |
Forrest France
|
|
|
Supply line flush completed acceptable.
|
INSP-Final Inspection | 1/14/2010 | 1/15/2010 | 1/15/2010 | A | PART |
Forrest France
|
|
|
Remainder of overhead rough-in okayed for cover at both basement and first floor levels.
|
INSP-Sprinkler Rough-in | 1/13/2010 | 1/14/2010 | 1/14/2010 | A | PART |
Forrest France
|
|
|
Overhead rough-in is satisfactory except as noted on plans-one area missing drops is incomplete, main level bedroom #2 head appears too close to a ceiling fan as marked on drawings, riser not yet tied in, discussed supply line flush, tenting is acceptable.
|
Issue and Print Permit | | | 11/13/2009 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/10/2009 | | 11/10/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are annotations on the plans.
|
1st review completed | | | 11/10/2009 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/10/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/10/2009 | | 11/10/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/10/2009 | | DONE |
|
|
|
t/c w adam at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/10/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/9/2009 | | DONE |
|
|
|
RECEIVED 3 APPLICATIONS, AND 4 SHEETS OF FP1 SENT TO TIM FROST
|
Telephone call | | | 10/28/2009 | | DONE |
Tisha Gallop
|
|
|
Called Shilo and told Melanie plans have been recovered and are here and ready to be picked up and issued.
|
Telephone call | | | 10/27/2009 | | DONE |
|
|
|
Told Gerald the plans were lost but I could get an additional copy made. He said to hold off because there is controversy in regards to the meter size. Therefore the project has not and cannot be picked up at this time. The project is hold awaiting a call from Gerald.
|
Sprinkler Plan Check | 10/22/2009 | | 10/22/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 10/22/2009 | | 10/22/2009 | | DONE |
|
|
|
|
Telephone call | | | 10/22/2009 | | DONE |
|
|
|
t/c w adam at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/22/2009 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 10/16/2009 | | 10/21/2009 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/21/2009 | | 10/21/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/21/2009 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 10/21/2009 | | DONE |
|
|
|
t/c w adam at ###-#### - permit denied - needs to be picked up and resubmitted
|
Application received | | | 10/16/2009 | | |
|
|
|
|
Pending Assignment by SAM | 10/16/2009 | | 10/16/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
10/16/2009 16:49:55 ALR - activity updated through activity FIRA158 from case FIR09-00612.
|