Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberFIR09-00626
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 702 W IDAHO ST
Project NameKey Bank
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of relocating and adding sprinklers to accommodate new wall and ceiling configuration. The existing system is a 1 ¼"x 1 ¼" x 1" grid. The occupancy is not changing. The existing piping is CPVC. The existing and new sprinkler spacing is based upon 225 sf. All sprinklers are being changed from standard response to quick response.

(KEY BUISNESS CENTER - Key Bank Building - 10th Floor) Permit is to reconfigure an existing 6,660 square foot office space to meet the needs of a new tenant. This is an existing high-rise building. Work to include: construction of interior non-bearing walls, installation of interior doors and associated accessible hardware, installation of new lighting, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  1/6/2010 DONE
DetailsTim Frost
Sent for scanning.
INSP-Final Inspection12/21/200912/21/200912/21/2009PPASS
DetailsForrest France
Fire sprinkler permit work finaled.
INSP-Sprinkler Rough-in/Hydro11/9/200911/9/200911/9/2009PPART
DetailsForrest France
Overhead hydrostatic test passed after one leaking head repaired while on site.
INSP-Sprinkler Rough-in11/9/200911/9/200911/9/2009APART
DetailsForrest France
Overhead fire sprinkler modifications and minor field adjustments in spacing and head locations are approved for ceiling cover at the remodel areas. Quick response head change out for the floor level per scope of work also completed satisfactory.
Plan assigned to (Tim)11/2/2009 11/3/2009 DONE
DetailsTim Frost
11/3/2009 09:52:38 TRF - activity updated through activity FIRA22 from case FIR09-00626.
Sprinkler Plan Check11/3/2009 11/3/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  11/3/2009 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/3/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire11/3/2009 11/3/2009 DONE
Details
Telephone call  11/3/2009 DONE
Details
t/c w damaris at ###-#### - permit ready and fees given
Permit Ready to Issue  11/3/2009 DONE
Details
Issue and Print Permit  11/3/2009 DONE
Application received  11/2/2009  
Pending Assignment by SAM11/2/2009 11/2/2009 DONE
DetailsAlexandra L. DeYoung
11/2/2009 15:54:33 ALR - activity updated through activity FIRA158 from case FIR09-00626.