Miscellaneous action | | | 1/6/2010 | | DONE |
Tim Frost
|
|
|
Sent for scanning.
|
INSP-Final Inspection | 12/21/2009 | 12/21/2009 | 12/21/2009 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit work finaled.
|
INSP-Sprinkler Rough-in/Hydro | 11/9/2009 | 11/9/2009 | 11/9/2009 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test passed after one leaking head repaired while on site.
|
INSP-Sprinkler Rough-in | 11/9/2009 | 11/9/2009 | 11/9/2009 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications and minor field adjustments in spacing and head locations are approved for ceiling cover at the remodel areas. Quick response head change out for the floor level per scope of work also completed satisfactory.
|
Plan assigned to (Tim) | 11/2/2009 | | 11/3/2009 | | DONE |
Tim Frost
|
|
|
11/3/2009 09:52:38 TRF - activity updated through activity FIRA22 from case FIR09-00626.
|
Sprinkler Plan Check | 11/3/2009 | | 11/3/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 11/3/2009 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/3/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/3/2009 | | 11/3/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/3/2009 | | DONE |
|
|
|
t/c w damaris at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/3/2009 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/3/2009 | | DONE |
|
|
|
|
Application received | | | 11/2/2009 | | |
|
|
|
|
Pending Assignment by SAM | 11/2/2009 | | 11/2/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
11/2/2009 15:54:33 ALR - activity updated through activity FIRA158 from case FIR09-00626.
|