Permit Information
Permit NumberFIR09-00635
StatusFinaled
Name DOHERTY ELECTRIC
Site Address 7808 W FAIRVIEW AVE
Project NameDEPT OF HEALTH & WELFARE
Customer Number 
ePlanReview 
Description
8/31/10 PLAN MODIFICATION: - 0 initiating devices affected
This plan modification is to incorporate field modifications and review comments for the notification devices.

11/10/09 This fire alarm permit is to provide audible/visible notification to new public and/or common use areas created by the tenant remodel and to maintain audibility throughout any altered areas. Devices are to be connected to previously installed remote power supply. No initiating devices are part of this permit scope.

Associated building permit: BLD09-00945 (IDAHO DEPARTMENT OF HEALTH AND WELFARE) (INTERIOR REMODEL) (SOUTH BUILDING) Fire sprinklers used for building area increase and for code trade-offs. To remodel the interior of an existing 73,639 square foot building for the current tenant. Several existing restrooms will be upgraded to be accessible to the disabled. Work is to include interior nonbearing walls, interior doors, interior windows, millwork, finishes, and an exterior ramp. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The fire sprinkler system is required to be upgraded to comply with current standards, including quick-response sprinklers, in order to avoid enclosed 1-hr fire-resistance-rated corridors. Elements of the existing fire sprinkler system that already comply with current standards may remain without upgrade. This building remodel will be done in phases. Occupancy of a completed phase shall be coordinated with the Structural Inspector and Fire Inspector. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  9/20/2010 DONE
FA plans taken to records for scanning.
INSP-Final Inspection9/7/20109/8/20109/8/2010APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection9/1/20109/3/20109/3/2010AFAIL
DetailsTroy Cobbley
Provide approved map with all required information and mount at the facp.
Telephone call  9/3/2010 DONE
Rob Ahten with Protex called regarding the required map indicating an updated/current plan showing the intiating devices. He wanted to know if he was required to provide it even if he did not modify any intiating devices. I let him know that, while the comment was not on the comments for this particular permit, that it is on permit FIR10-00013. I let him know it would be his responsibility. He stated confusion over other projects he said he has not had to do this on. I let him know that in years passed, we have only required an updated map if initiating devices were being modified in the scope of work. But, I let him know that in recent years, the fire department has had trouble with older buildings not having updated maps and that the response times have been hindered. They (the fire department) have requested that every fire alarm permit (regardless of initiating devices being affected or not) address the map being updated. I informed Rob that he should just count on, for every fire alarm permit, updating the map.
CHANGE STATUS TO (ISS)  9/1/2010 DONE
Inspection Record Card- Fire9/1/2010 9/1/2010 DONE
DetailsPatricia Smith
Telephone call  9/1/2010 DONE
t/c w mike at ###-#### - permit ready and fees given
Permit Ready to Issue  9/1/2010 DONE
Details
Plan assigned to (Stephanie)8/24/2010 8/31/2010 DONE
DetailsStephanie L. Cobbley
8/31/2010 15:09:54 SLC - activity updated through activity FIRA24 from case FIR09-00635.
Alarm Plan Check8/31/2010 8/31/2010 PASS
DetailsStephanie L. Cobbley
plan modification approved
PLANS TAKEN FRONT DESK ALARM  8/31/2010 DONE
Approved plan modification documents available at front counter
Plan resubmittals received  8/24/2010 DONE
DetailsTisha Gallop
plan mod rec'd 2 sets
Miscellaneous action  6/1/2010 DONE
A scope of work modification was allowed via email with the understanding it would be included in the plan modificaiton prior to final inspection. See attached document showing the changes. This is due to remodeling no longer being done in the areas of phasees10,11,&12.
INSP-Alarm Testing5/14/20105/14/20105/14/2010PDONE
DetailsTroy Cobbley
Fire sprinkler risers #2 and #3 inspected today. Flow switches and tamper switches functioned correctly. These items are not shown on the fire alarm plans and will need to be included when the plan modifications are submitted prior to a final sign off.
INSP-Alarm Testing4/20/20104/21/20104/20/2010ACANC
DetailsTroy Cobbley
If possible could we get before 8:00am. Nick is the contact his no. is ###-####. Thank you. Inspection requested from web by: Shawna Gates Phone #: ###-#### Inspection cancelled from web by: Shawna Gates
INSP-Alarm Testing4/19/20104/20/20104/19/2010ACANC
DetailsTroy Cobbley
Nick is the contact his no. is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-#### Inspection cancelled from web by: Shawna Gates
INSP-Alarm Testing4/15/20104/16/20104/15/2010ACANC
DetailsTroy Cobbley
Nick is the onsite contact his no. is ###-####. Thank you. Inspection requested from web by: Shawna Gates Phone #: ###-#### Inspection cancelled from web by: Shawna Gates
INSP-Alarm Testing3/23/20103/24/20103/24/2010APASS
DetailsTroy Cobbley
The lobby area horn/strobes of phase 6 functioned correctly.
INSP-Alarm Testing3/22/20103/23/20103/23/2010APASS
DetailsTroy Cobbley
The phase 8 existing fire alarm horns operated. We found that the new a/v's in the main lobby had not been inspected or connected to the NAC panel.
INSP-Alarm Testing12/3/200912/3/200912/3/2009PDONE
DetailsTroy Cobbley
Phase 4 fire alarm installation and testing is complete.
INSP-Final Inspection12/2/200912/3/200912/3/2009AFAIL
DetailsTroy Cobbley
This inspection is for phase 4. One additional horn/strobe needs to be installed as per the approved plans. Also horn only devices were not installed in the right hand corridor system of phase 4 as per the plans. Either re-install the horns or provide code compliant coverage through out the entire space served by the corridor system which includes the Lobby area.
Issue and Print Permit  11/17/2009 DONE
Plan assigned to (Stephanie)11/5/2009 11/10/2009 DONE
DetailsStephanie L. Cobbley
11/10/2009 08:35:12 SLC - activity updated through activity FIRA24 from case FIR09-00635.
1st review completed  11/10/2009 DONE
Alarm Plan Check11/10/2009 11/10/2009 PASS
DetailsStephanie L. Cobbley
See review comments and redlines
PLANS TAKEN FRONT DESK ALARM  11/10/2009 DONE
Approved redlined plans available at front counter
Inspection Record Card- Fire11/10/2009 11/10/2009 DONE
Details
Telephone call  11/10/2009 DONE
Details
left vm for mike at ###-#### - permit ready and fees given
Permit Ready to Issue  11/10/2009 DONE
Details
Application received  11/5/2009