Miscellaneous action | | | 3/16/2010 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 3/1/2010 | 3/1/2010 | 3/2/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
CHANGE STATUS TO (ISS) | | | 3/1/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Stephanie) | 2/22/2010 | | 2/26/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
2/26/2010 14:06:51 SLC - activity updated through activity FIRA24 from case FIR09-00641.
|
Alarm Plan Check | 2/26/2010 | | 2/26/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved with redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 2/26/2010 | | DONE |
|
|
|
approved redlined plans available at front counter
|
Inspection Record Card- Fire | 2/26/2010 | | 2/26/2010 | | DONE |
|
|
|
|
Telephone call | | | 2/26/2010 | | DONE |
|
|
|
t/c w rand at ###-#### - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 2/26/2010 | | DONE |
|
|
|
|
INSP-Alarm Testing | 2/22/2010 | 2/22/2010 | 2/22/2010 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Scott's permission until the as-built fire alarm plans have been reviewed, approved and any changes inspected. When this is done the permit can be finaled.
|
Plan resubmittals received | | | 2/22/2010 | | |
Tisha Gallop
|
|
|
Plan modification: received application, data sheets and plan sheets FA-1, FA-2; taken to Fire Review
|
INSP-Alarm Testing | 2/19/2010 | 2/19/2010 | 2/19/2010 | P | FAIL |
Troy Cobbley
|
|
|
The testing and inspection is complete except for resubmittals showing all of the changes including wall mount a/v's and the additional common area smoke detectors/av's in the new "rehab" room. The door holder circuit and the hvac shutdown was repaired while I was on site.
|
INSP-Final Inspection | 2/18/2010 | 2/18/2010 | 2/18/2010 | P | FAIL |
Troy Cobbley
|
|
|
The FACP panel, phone line troubles, battery troubles, type 1 hood suppression system interconnection and the interconnections with the new fire alarm system passed. Also passed were the system smoke detectors located in the central wing. The system smoke detectors in the west wing did not function correctly due to one detector being smoked in a room activated the sounder base in a room across the hall. I let Micheal know that resubmittals will be required showing the additional door magnet interconnections.
|
INSP-Alarm Testing | 2/16/2010 | 2/16/2010 | 2/16/2010 | P | CANC |
Troy Cobbley
|
|
|
Cancelled per Michael or ###-#### Rand Phone #: ###-####
|
Issue and Print Permit | | | 11/20/2009 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 11/10/2009 | | 11/13/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
11/13/2009 13:40:03 SLC - activity updated through activity FIRA24 from case FIR09-00641.
|
Telephone call | | | 11/13/2009 | | DONE |
|
|
|
Left a message for Rand at Alarm Star to get clarification on the sprinkler monitoring devices as well as the one-line symbols not being consistent with the floor plans.
|
1st review completed | | | 11/13/2009 | | DONE |
|
|
|
|
Alarm Plan Check | 11/13/2009 | | 11/13/2009 | | PASS |
Stephanie L. Cobbley
|
|
|
See redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 11/13/2009 | | DONE |
|
|
|
Approved redlined plans available at front counter
|
Inspection Record Card- Fire | 11/13/2009 | | 11/13/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/13/2009 | | DONE |
|
|
|
left vm for rand at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/13/2009 | | DONE |
|
|
|
|
Case Summary | | | 11/10/2009 | | DONE |
|
|
|
|
Application received | | | 11/10/2009 | | |
|
|
|
|