INSP-Final Inspection | 12/2/2009 | 12/2/2009 | 12/2/2009 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled, inspection passed.
|
1st review completed | | | 11/19/2009 | | DONE |
Troy Cobbley
|
|
|
|
Sprinkler Plan Check | 11/19/2009 | | 11/19/2009 | | DONE |
Troy Cobbley
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2009 | | DONE |
Troy Cobbley
|
|
|
|
Issue and Print Permit | | | 11/19/2009 | | DONE |
|
|
|
|
1st review completed | | | 11/13/2009 | | DONE |
|
|
|
|
Alarm Plan Check | 11/13/2009 | | 11/13/2009 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans failed per site review by T. Cobbley. One existing sprinkler head is overspaced from an existing wall.
|
Plan assigned to (Scott) | | | 11/11/2009 | | DONE |
Sam Rogers
|
|
|
This permit was created on the web by Paul Marcolina
|
Plan assigned to (SAM) | | | 11/11/2009 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|