Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR09-00649
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 190 E BANNOCK ST
Project NameST LUKES
Customer Number 
ePlanReview 
Description
Quick Permit
Add and relocate 18 sprinklers to accomodate new wall and ceiling configurations.
ST LUKES)(3RD & 4TH FLR)(3C-ENDOVASCULAR OR TI) Tenant improvement includes selective demolition and remodel of portion of the third floor, North Wing, Endovascular O.R and clean supply room, approximately 1,460 sq. ft. An existing electrical supply penthouse located at the Central Wing fourth floor is to be removed to allow space for a new Roof Top Air-Handling Unit and associated roof improvements. Scope of work includes expansion of Endovascular O.R. into the existing Clean Supply room and add a Control Room for the O.R.; install lead-lined gypsum wall board to a height of 7' a.f.f. with lead lined window at O.R. & Control Room; relocate lead lined entry door / hardware / view panel to O.R; complete interior finishes, millwork, electrical, mechanical, plumbing, sprinkler and alarm modifications. Connect new equipment per structural details of plans & add W12x26 steel beams to support new RTU equipment. Provide Special Inspection per ESR 1917, Hilti KWIK BOLT TZ & ESR 2262, Hilti HIT-HY 150 MAX Adhesive Anchors for concrete, copies attached to plans. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/1/20107/1/20107/1/2010APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection4/23/20104/23/20104/26/2010APART
DetailsForrest France
Pending ceiling tile and escutcheons.
INSP-Sprinkler Rough-in4/21/20104/21/20104/21/2010PPART
DetailsForrest France
Overhead rough-in approved at the drop ceilings as annotated on stamped drawing, verified QR heads installed at the corridor, control room OH to be verified in conjunction with project related fire alarm inspection.
INSP-Sprinkler Rough-in3/24/20103/25/20103/25/2010APART
DetailsForrest France
See stamped plan for annotations marked with today's date red-lined as okay for cover- includes six pendent heads at the surgery suite.
INSP-Sprinkler Rough-in2/16/20102/16/20102/18/2010PNR
DetailsForrest France
FIR-Aging Inspection2/11/20102/11/20102/17/2010 DONE
DetailsForrest France
Site visit scheduled
Application received  11/12/2009  
Plan assigned to (Tim)11/12/2009 11/12/2009 DONE
DetailsTim Frost
11/12/2009 14:23:02 TRF - activity updated through activity FIRA22 from case FIR09-00649.
Sprinkler Plan Check11/12/2009 11/12/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are annotations on the plans.
1st review completed  11/12/2009 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/12/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire11/12/2009 11/12/2009 DONE
Details
Telephone call  11/12/2009 DONE
Details
t/c w brodie at ###-#### - permit ready and fees given
Permit Ready to Issue  11/12/2009 DONE
Details
Issue and Print Permit  11/12/2009 DONE