INSP-Final Inspection | 7/1/2010 | 7/1/2010 | 7/1/2010 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 4/23/2010 | 4/23/2010 | 4/26/2010 | A | PART |
Forrest France
|
|
|
Pending ceiling tile and escutcheons.
|
INSP-Sprinkler Rough-in | 4/21/2010 | 4/21/2010 | 4/21/2010 | P | PART |
Forrest France
|
|
|
Overhead rough-in approved at the drop ceilings as annotated on stamped drawing, verified QR heads installed at the corridor, control room OH to be verified in conjunction with project related fire alarm inspection.
|
INSP-Sprinkler Rough-in | 3/24/2010 | 3/25/2010 | 3/25/2010 | A | PART |
Forrest France
|
|
|
See stamped plan for annotations marked with today's date red-lined as okay for cover- includes six pendent heads at the surgery suite.
|
INSP-Sprinkler Rough-in | 2/16/2010 | 2/16/2010 | 2/18/2010 | P | NR |
Forrest France
|
|
|
|
FIR-Aging Inspection | 2/11/2010 | 2/11/2010 | 2/17/2010 | | DONE |
Forrest France
|
|
|
Site visit scheduled
|
Application received | | | 11/12/2009 | | |
|
|
|
|
Plan assigned to (Tim) | 11/12/2009 | | 11/12/2009 | | DONE |
Tim Frost
|
|
|
11/12/2009 14:23:02 TRF - activity updated through activity FIRA22 from case FIR09-00649.
|
Sprinkler Plan Check | 11/12/2009 | | 11/12/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are annotations on the plans.
|
1st review completed | | | 11/12/2009 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/12/2009 | | 11/12/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/12/2009 | | DONE |
|
|
|
t/c w brodie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/12/2009 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/12/2009 | | DONE |
|
|
|
|