Permit Information
Permit NumberFIR09-00651
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 2796 S VICTORY VIEW WAY
Project NameVic Park Bldg 3
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of adding and relocating sprinklers to accommodate new wall and ceiling configuration. The existing system is a 6"x4"x2 ½" Grid designed for .495/2000 utilizing K=25.2 sprinklers. The new TI is predominantly light hazard except for a parking storage area, which is Ordinary Hazard Group I. The existing LO sprinklers are being used for the parking area. The remainder of the sprinklers are being changed to QR K=5.6 and K=11.2 (18'x18' spacing). The existing structure is steel bar joist. A new full height-demising wall is being added. The new wall required additional sprinklers due to spacing on the side opposite of the TI.

Vic Park Bldg 3: (Vanilla finish) Permit for minor tenant improvements to create a 6,012 sq. ft. tenant space in a 32,942 sq. ft. shell building with work to include the infill of on overhead door and man door, removal of two knock out panels (one for a overhead door and one for a man door), the construction of a 8" fuly grouted reinforced CMU tenant demizing wall to the roof deck and the construction of a truck ramp. This is a fully sprinklered building; any alterations to the sprinkler system will require a separate permit and shall comply with NFPA13 as regulated by Boise City Fire Department. All work to be done per the approved plans, plan review report, CZC09-00181 and any notations. The shell building was constructed under BLD07-00737. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/8/2010 DONE
Plans sent to scanning.
INSP-Final Inspection2/4/20102/5/20102/5/2010APASS
DetailsTroy Cobbley
Permit finaled. The extended pendants have been added in the small offices.
INSP-Sprinkler Rough-in2/1/20102/1/20102/1/2010PPASS
DetailsTroy Cobbley
Sprinkler piping is ok to cover. I noted that atleast two pendant heads in the small rooms are blocked by the surface mounted lights. Mike and Sam are going to provide longer 401 canopies to spray below the lights. I will check these on final.
Issue and Print Permit  11/19/2009 DONE
Plan assigned to (Tim)11/12/2009 11/16/2009 DONE
DetailsTim Frost
11/16/2009 13:48:51 TRF - activity updated through activity FIRA22 from case FIR09-00651.
Sprinkler Plan Check11/16/2009 11/16/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  11/16/2009 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/16/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire11/16/2009 11/16/2009 DONE
Details
Telephone call  11/16/2009 DONE
Details
t/c w lisa at ###-#### - permit ready and fees given
Permit Ready to Issue  11/16/2009 DONE
Details
Application received  11/12/2009  
Pending Assignment by SAM11/12/2009 11/12/2009 DONE
DetailsPatricia Smith
11/12/2009 12:52:16 P_S - activity updated through activity FIRA158 from case FIR09-00651.