Miscellaneous action | | | 3/8/2010 | | DONE |
|
|
|
Plans sent to scanning.
|
INSP-Final Inspection | 1/8/2010 | 1/8/2010 | 1/8/2010 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 12/22/2009 | 12/23/2009 | 12/23/2009 | A | PART |
Forrest France
|
|
|
Overhead modifications at the tenant remodel okayed for cover, noted minor field changes at one room and matched to existing heads at the common corridor are acceptable.
|
Issue and Print Permit | | | 11/19/2009 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 11/16/2009 | | 11/18/2009 | | DONE |
Tim Frost
|
|
|
11/18/2009 14:54:10 TRF - activity updated through activity FIRA22 from case FIR09-00657.
|
Sprinkler Plan Check | 11/18/2009 | | 11/18/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 11/18/2009 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2009 | | DONE |
Tim Frost
|
|
|
|
Override - People Holds | | | 11/18/2009 | | |
|
|
|
|
Permit Ready to Issue | | | 11/18/2009 | | DONE |
|
|
|
|
Override - People Holds | | | 11/18/2009 | | |
|
|
|
|
Inspection Record Card- Fire | 11/18/2009 | | 11/18/2009 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 11/18/2009 | | DONE |
Barbara Stitt
|
|
|
Called and told them that permit is ready & fees due///11-18-09 @ 3:15pm BAS
|
Application received | | | 11/16/2009 | | |
|
|
|
|
Pending Assignment by SAM | 11/16/2009 | | 11/16/2009 | | DONE |
Patricia Smith
|
|
|
11/16/2009 10:49:21 P_S - activity updated through activity FIRA158 from case FIR09-00657.
|