Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR09-00657
StatusFinaled
Name WESTERN STATES FIRE PROTECTION
Site Address 1444 S ENTERTAINMENT AVE Unit: 325
Project NameSTEVENS HENAGER COLLEGE
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of adding and relocating sprinkles to accommodate new wall and ceiling configurations for a tenant improvement. The existing system is design for light hazard utilizing a 3"x2 ½"x1 ¼" Grid. The construction is reported to have steel beams with a concrete floor therefore above protection is not required.

(STEVENS-HENAGER COLLEGE - 3rd Floor - East Suite #325) ***11/12/09 - PLAN MODIFICATION FOR THE ADDITION OF NON-STRUCTURAL INTERIOR WALLS, ADDITIONAL LIGHTING, AND DOORS TO CREATE: OFFICE SPACES, A LEARNING CENTER, AND A VOCATIONAL LAB. ALL WORK PER THE APPROVED PLANS RECIEVED ON NOV. 5 2009*** For a first time minor tenant improvement on the third floor of an existing shell building. This Office tenant space has a total of 2712 square feet and will consist of open office area, a reception area, and two entry/exit points with work to include: remove door frame and portions of walls for new doors, relocate existing fire extinguisher cabinet, construction of interior office walls, installation of acoustical suspended ceiling, HVAC/mechanical work, electrical work, and misc. interior finish work. The core areas of this floor were finished under the shell and core permit (BLD06-01621). Sprinklers were used for height and story increase. This building is fully sprinklered. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA13 as regulated by the Boise City Fire Department. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/8/2010 DONE
Plans sent to scanning.
INSP-Final Inspection1/8/20101/8/20101/8/2010PPASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in12/22/200912/23/200912/23/2009APART
DetailsForrest France
Overhead modifications at the tenant remodel okayed for cover, noted minor field changes at one room and matched to existing heads at the common corridor are acceptable.
Issue and Print Permit  11/19/2009 DONE
Plan assigned to (Tim)11/16/2009 11/18/2009 DONE
DetailsTim Frost
11/18/2009 14:54:10 TRF - activity updated through activity FIRA22 from case FIR09-00657.
Sprinkler Plan Check11/18/2009 11/18/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  11/18/2009 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/18/2009 DONE
DetailsTim Frost
Override - People Holds  11/18/2009  
Permit Ready to Issue  11/18/2009 DONE
Override - People Holds  11/18/2009  
Inspection Record Card- Fire11/18/2009 11/18/2009 DONE
DetailsBarbara Stitt
Telephone call  11/18/2009 DONE
DetailsBarbara Stitt
Called and told them that permit is ready & fees due///11-18-09 @ 3:15pm BAS
Application received  11/16/2009  
Pending Assignment by SAM11/16/2009 11/16/2009 DONE
DetailsPatricia Smith
11/16/2009 10:49:21 P_S - activity updated through activity FIRA158 from case FIR09-00657.