Miscellaneous action | | | 1/14/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 3/29/2010 | 3/31/2010 | 3/31/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
(F) Reprint permit | | | 3/8/2010 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/8/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/5/2010 | | DONE |
|
|
|
received 3 sets of fire resubmittal plans sent to Tim Frost
|
Sprinkler Plan Check | 3/5/2010 | | 3/5/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/5/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 3/5/2010 | | 3/5/2010 | | DONE |
Rita DeYoung
|
|
|
|
Permit Ready to Issue | | | 3/5/2010 | | DONE |
Rita DeYoung
|
|
|
|
Miscellaneous action | | | 3/5/2010 | | DONE |
|
|
|
FIR09-00661 case history:
The initial plan set submittal (11/17/09) required 1 resubmittal prior to plan approval (11/19/09).
During the course of the field inspection (12/1/09) it was determined that the approved plans did not accurately represent the actual field installation, and therefore sprinkler plan modifications would be necessary.
The forthcoming plan modification submittal (2/18/10) required 2 subsequent plan reviews for final plan approval on (3/5/10).
The applicant now must request and pass a final fire field inspection for sign off of permanent occupancy of BLD09-01819.
|
Plan resubmittals received | | | 2/18/2010 | | |
Tim Frost
|
|
|
Plan Modification: Received three copies of application, data sheets and plan sheets FP-1, FP-2; taken to fire review.
|
Plan assigned to (Tim) | 2/18/2010 | | 2/18/2010 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/18/2010 | | 2/18/2010 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
Telephone call | | | 2/18/2010 | | DONE |
|
|
|
t/c w bernie at ###-#### - permit (plan mod) denied - needs to be picked up and resubmitted
|
Telephone call | | | 12/7/2009 | | DONE |
Tim Frost
|
|
|
Asked Brook to correlate the drawings and the existing system
|
Miscellaneous action | | | 12/2/2009 | | DONE |
Tim Frost
|
|
|
Hydraulic calculations were verified by TRF that the system can provide a .20 density over 2340 sf. Additional sprinklers were flowed due to spinklers in the remote area being spaced at 112 sf. However, some sprinklers outside of the remote area were spaced at 126 sf. Therefore the worst case scenario (126 sf) was used in the most remote area.. The remote area was only required to be 1500 sf.
|
INSP-Final Inspection | 11/30/2009 | 12/1/2009 | 12/1/2009 | A | FAIL |
Troy Cobbley
|
|
|
Per the approved plans the maximum head spacing as hydraulically calculated is 112 sq. ft. As installed in the field the pendant heads are spaced up to 126 sq. ft. and in some locations the pendant even exceed 15'-0" apart.. I spoke with John at Commercial FIre and with Tim Frost in the office about this issue.
|
Plan assigned to (Tim) | 11/17/2009 | | 11/30/2009 | | DONE |
Tim Frost
|
|
|
11/30/2009 10:49:34 TRF - activity updated through activity FIRA22 from case FIR09-00661.
|
Plan assigned to (Tim) | 11/25/2009 | | 11/30/2009 | | DONE |
Tim Frost
|
|
|
11/30/2009 10:49:34 TRF - activity updated through activity FIRA22 from case FIR09-00661.
|
Sprinkler Plan Check | 11/30/2009 | | 11/30/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/30/2009 | | 11/30/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/30/2009 | | DONE |
|
|
|
left message for lillie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 11/30/2009 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/30/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/25/2009 | | DONE |
|
|
|
received 3 application and 3 sets of plans - taken to tim frost
|
Sprinkler Plan Check | 11/19/2009 | | 11/19/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 11/19/2009 | | DONE |
Tim Frost
|
|
|
|
Case Summary | | | 11/17/2009 | | DONE |
|
|
|
|