Miscellaneous action | | | 3/8/2010 | | DONE |
|
|
|
Plans sent to scanning.
|
INSP-Final Inspection | 1/12/2010 | 1/13/2010 | 1/13/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 1/11/2010 | 1/11/2010 | 1/11/2010 | P | PART |
Forrest France
|
|
|
Final pending head and escutcheon at the new drop ceiling in the existing electrical room adjacent to the TI.
|
INSP-Final Inspection | 1/11/2010 | 1/11/2010 | 1/11/2010 | A | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 12/28/2009 | 12/29/2009 | 12/29/2009 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler work is approved for cover at the drop ceilings throughout the tenant improvement area, two added uprights at the shell side okayed to maintain adequate coverage.
|
Issue and Print Permit | | | 12/3/2009 | | DONE |
|
|
|
|
Application received | | | 12/2/2009 | | |
|
|
|
|
Sprinkler Plan Check | 12/2/2009 | | 12/2/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/2/2009 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/2/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 12/2/2009 | | 12/2/2009 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 12/2/2009 | | DONE |
|
|
|
t/c w randy at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 12/2/2009 | | DONE |
|
|
|
|
Pending Assignment by SAM | 12/2/2009 | | | | |
|
|
|
|