INSP-Final Inspection | 4/2/2010 | 4/5/2010 | 4/5/2010 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final inspection, remainder of c/n items finished while on site.
|
INSP-Final Inspection | 1/19/2010 | 1/19/2010 | 1/19/2010 | P | NR |
Forrest France
|
|
|
Need to remove tape and paper covering upright sprinklers at all locations, missing escutcheon and finishes throughout.
|
INSP-Final Inspection | 1/7/2010 | 1/7/2010 | 1/7/2010 | A | NH |
Forrest France
|
|
|
No access to complete inspection, appears construction is still underway.
|
INSP-Sprinkler Rough-in | 12/4/2009 | 12/4/2009 | 12/4/2009 | P | PART |
Forrest France
|
|
|
Fire sprinkler work okayed for cover at the restroom drop ceilings only.
|
Plan assigned to (Tim) | 12/2/2009 | | 12/3/2009 | | DONE |
Tim Frost
|
|
|
12/3/2009 09:40:21 TRF - activity updated through activity FIRA22 from case FIR09-00684.
|
Sprinkler Plan Check | 12/3/2009 | | 12/3/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/3/2009 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 12/3/2009 | | 12/3/2009 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 12/3/2009 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 12/3/2009 | | DONE |
Barbara Stitt
|
|
|
Called Jeff Packham and told him that permit is ready & fees due///12-3-09 @ 10:20am BAS
|
Issue and Print Permit | | | 12/3/2009 | | DONE |
|
|
|
|
Application received | | | 12/2/2009 | | |
|
|
|
|