Permit Information
Permit NumberFIR09-00707
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 4610 W HILLCREST DR
Project NameHillcrest Country Club
Customer Number 
ePlanReview 
Description
**Plan Modification Adding, four sprinklers to remote area four and one sprinkler to remote area 2. New hydraulics were provided.**
Original Fire Work Scope: The Fire Sprinkler Scope of work consists of renovating an existing fire protection system to accommodate new wall and ceiling configuration. The existing fire protection system will be extended to provide sprinklers in two new additions. The fire protection consists of above and below protection. There are two levels in this building each level has a separate riser. The construction has been divided into two phase. The entire building is to have fire protection. In most of the existing areas, the sprinklers are being changed to quick response type.

Hillcrest Country Club - Phase I Addition and Remodel - Phase I includes remodel of the entire building on the west side of the fire wall, plus 750 square feet on the east side of the fire wall (everything west of grid line S). To demo and remove the structure at the Garden Court areas. To demo and removed most of the interior partitions, ceilings and finishes, except at Mech/Elect Room #124 and the stairways. Demo and remove a large portion of the west exterior wall, planters and exterior stairways. To construct a new 4,150 sq. ft. basement and 3,875 sq. ft., wood framed first floor addition on the west end of the existing club house building. To construct new covered patio and entry areas. To refinish the interior to include new men's and women's lounges, showers, locker rooms and restrooms, new golf shop, fitness area, kitchen and bar/dining area. There is a two-hour, masonry firewall constructed at grid line Q. The area of the Phase I project is 18,900 square feet with a 11,900 square foot basement. This building is fully fire sprinkled. The sprinklers are used for area increase. The area on the west side of the firewall is 18,150 sq. ft. with an 11,900 sq. ft. basement; the area on the east side of the fire wall is 21,710 sq. ft. with a 1,535 sq. ft. basement. This permit is for Phase I of the project only. A separate tenant improvement permit will be required to finish Phase II. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  1/14/2011 DONE
Sent to records for scanning.
INSP-Final Inspection7/22/20107/26/20107/26/2010APASS
DetailsTroy Cobbley
The forward flush passed. Permit for Phase I passed.
INSP-Final Inspection5/25/20105/26/20105/26/2010AFAIL
DetailsTroy Cobbley
The alarm interconnection for the devices located in phase I were tested today. It appears the only outstanding item for phase I is the forward flush failed.
INSP-Sprinkler Rough-in5/20/20105/21/20105/21/2010APART
DetailsForrest France
Walkthrough of phase one completed, noted one head at the kitchen area out of adjustment, missing escutcheon at one dry pendent north side entry, one room at the first floor is missing a ceiling at this time. Remainder of inspection passed, final pending fire alarm testing for riser supervision.
INSP-Sprinkler Rough-in5/14/20105/14/20105/14/2010PPASS
DetailsTroy Cobbley
The fire sprinklers are complete in the pool/shower area.
INSP-Sprinkler Rough-in5/5/20105/5/20105/5/2010PPASS
DetailsTroy Cobbley
The pendants/piping in the corridor at the pool area is ok for cover.
INSP-Sprinkler Rough-in/Hydro5/4/20105/4/20105/4/2010PPASS
DetailsTroy Cobbley
The overhead hydro test for all of the new sprinkler piping passed. Also see the city approved plans for additional areas where sprinkler piping can be covered.
INSP-Sprinkler Rough-in/Hydro3/31/20104/1/20104/1/2010APASS
DetailsTroy Cobbley
The sprinkler rough-in and the hydro test for the basement area. This includes the anti-freeze loop.
INSP-Sprinkler Rough-in3/26/20103/26/20103/26/2010PPASS
DetailsTroy Cobbley
see the city approved plans for piping the is ok for cover.
INSP-Sprinkler Rough-in3/18/20103/19/20103/19/2010APART
DetailsForrest France
Pendent head at the locker room vestibule hard lid ceiling is okay for cover- see clouded area with today's date and initials on approved plan set sheet FP-4.
INSP-Sprinkler Rough-in3/16/20103/17/20103/17/2010APART
DetailsForrest France
See stamped plan set sheet FP-4 for clouded area initialed and marked with today's date for locations of overhead work at sheetrock ceilings okayed for cover. Missing coverage at one adjacent vestibule to be verified prior to cover and not included in this inspection.
INSP-Sprinkler Rough-in/Hydro3/10/20103/10/20103/10/2010PPASS
DetailsTroy Cobbley
The overhead hydro tests of the new west end wet system piping and the anti-freeze system/south canopy passed. The combustible concealed pockets on the previous correction notice have been provided with sprinkler coverage and can be covered as marked ok on the city approved plans.
INSP-Sprinkler Rough-in3/2/20103/3/20103/3/2010APASS
DetailsTroy Cobbley
See the city approved plans for locations where rough-in inspection passed and other areas marked "ok" where piping can be covered. I noted atleast two locations where a combustible concealed area existing that has no sprinkler protection and a location where a pendant head symbol is used on the plans but is not included in the head symbol legend. John is following up with the design department.
INSP-Sprinkler Rough-in3/2/20103/2/20103/2/2010PCANC
DetailsTroy Cobbley
John was not quite ready for inspection when I was available so we've rescheduled for first thing tomorrow morning.
INSP-Sprinkler Rough-in2/25/20102/25/20102/25/2010PPART
DetailsForrest France
Antifreeze system piping at the west canopy as marked on approved plan set with todays date and initialed okay for cover, one minor adjustment made while on sie, also okayed insulation fill at perimeter soffits on the new porte cochere.
INSP-Sprinkler Rough-in2/22/20102/22/20102/22/2010PPASS
DetailsTroy Cobbley
The modified underground supply piping is ok to cover. The old supply line has been capped off and abandoned.
INSP-Sprinkler Rough-in2/18/20102/19/20102/19/2010APASS
DetailsTroy Cobbley
See the city approved plans for locations where the sprinkler piping can be covered. They have been marked in red.
INSP-Sprinkler Rough-in2/18/20102/18/20102/18/2010PCANC
DetailsTroy Cobbley
Cancelled due to time constraints. Rescheduled with John Phone #: ###-#### for tomorrow morning.
INSP-Sprinkler Rough-in2/8/20102/9/20102/9/2010APASS
DetailsTroy Cobbley
See the city approved plans for locations where the sprinkler piping can be covered.
Plan resubmittals received  2/4/2010  
DetailsTim Frost
rec'd 3 sets
Plan assigned to (Tim)2/4/2010 2/4/2010 DONE
DetailsTim Frost
2/4/2010 10:49:43 TRF - activity updated through activity FIRA22 from case FIR09-00707.
Sprinkler Plan Check2/4/2010 2/4/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  2/4/2010 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  2/4/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire2/4/2010 2/4/2010 DONE
Details
Telephone call  2/4/2010 DONE
Details
t/c w chris wilson at ###-#### - permit (plan mod) ready and fees given
Permit Ready to Issue  2/4/2010 DONE
Details
CHANGE STATUS TO (ISS)  2/4/2010 DONE
INSP-Sprinkler Rough-in1/28/20101/28/20101/28/2010PPART
DetailsTroy Cobbley
See the city approved plans for locations marked "ok" in red where piping can be covered. Part of todays inspection included the new system at the west end of the building. Here I found at least two additional sprinkler heads added in the remote area and per the plans the pendant heads in the attic area are mounted on the branchlines. As installed there are two 90 elbows and 1" piping between the branchline and the pendant heads. This occurs in the remote area. I spoke to John on site and Jeff in Treasure Valley Fires office about the need for resubmittals or at the very least contacting Tim Frost with plan review.
INSP-Sprinkler Rough-in1/25/20101/25/20101/25/2010PCANC
DetailsTroy Cobbley
Cancel this inspection per Jeremy since work was not complete. Plans were just issued today but an early start agreement was issued on 12-28-2009.
Issue and Print Permit  1/25/2010 DONE
Sprinkler Plan Check1/22/2010 1/22/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  1/22/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire1/22/2010 1/22/2010 DONE
DetailsPatricia Smith
Telephone call  1/22/2010 DONE
Details
t/c w jeff packham at ###-#### - permit ready and fees given
Permit Ready to Issue  1/22/2010 DONE
Details
Plan resubmittals received  1/21/2010  
DetailsTim Frost
rec'd 3 sets of plans
Miscellaneous action  1/20/2010 DONE
DetailsTim Frost
Emailed comments to Chris
Sprinkler Plan Check1/20/2010 1/20/2010 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Telephone call  1/20/2010 DONE
t/c w chris at ###-#### - permit denied - needs to be picked up and resubmitted
Plan resubmittals received  1/19/2010  
DetailsTim Frost
rec'd 3 sets of plans
Telephone call  12/18/2009 DONE
Details
t/c w chris at ###-#### - permit denied - needs to be picked up and resubmitted
Plan assigned to (Tim)12/15/2009 12/17/2009 DONE
DetailsTim Frost
Sprinkler Plan Check12/17/2009 12/17/2009 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  12/17/2009 DONE
DetailsTim Frost
Miscellaneous action  12/17/2009 DONE
DetailsTim Frost
Emailed review to Chris
Application received  12/15/2009  
Pending Assignment by SAM12/15/2009 12/15/2009 DONE
DetailsAlexandra L. DeYoung
12/15/2009 11:16:04 ALR - activity updated through activity FIRA158 from case FIR09-00707.