Miscellaneous action | | | 6/7/2010 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 5/6/2010 | 5/7/2010 | 5/7/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. The netcon was a 5.
|
INSP-Final Inspection | 2/8/2010 | 2/11/2010 | 2/11/2010 | A | FAIL |
Troy Cobbley
|
|
|
The NetCon was a 6 and the manual pull station had been installed above 48". No other testing was performed.
|
Issue and Print Permit | | | 1/20/2010 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 12/16/2009 | | 12/30/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
12/30/2009 08:34:47 SLC - activity updated through activity FIRA24 from case FIR09-00717.
|
Plan assigned to (Stephanie) | 12/16/2009 | | 12/30/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
12/30/2009 08:34:47 SLC - activity updated through activity FIRA24 from case FIR09-00717.
|
Alarm Plan Check | 12/30/2009 | | 12/30/2009 | | PASS |
Stephanie L. Cobbley
|
|
|
see review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 12/30/2009 | | DONE |
|
|
|
approved plans available at front counter
|
Inspection Record Card- Fire | 12/30/2009 | | 12/30/2009 | | DONE |
|
|
|
|
Telephone call | | | 12/30/2009 | | DONE |
|
|
|
t/c w mike madsen at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 12/30/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/23/2009 | | |
Tisha Gallop
|
|
|
received application and two copies of folder with submittal info and plan sheet FA00; taken to fire review
|
1st review completed | | | 12/18/2009 | | DONE |
|
|
|
|
Alarm Plan Check | 12/18/2009 | | 12/18/2009 | | FAIL |
Stephanie L. Cobbley
|
|
|
AES shown to be used as the FACP which is against code requirements and is not allowed.
|
Telephone call | | | 12/18/2009 | | DONE |
|
|
|
left a message for Mary Froemke and spoke to Mike at Peak Alarm letting them know the plans are denied because the AES is shown to be used as the FACP which is against code requirements and is not allowed.
|
Miscellaneous action | | | 12/18/2009 | | DONE |
|
|
|
Faxed a statement to Mike at Peak Alarm with the reasons listed for why the plans failed.
|
Application received | | | 12/16/2009 | | |
|
|
|
|