Miscellaneous action | | | 2/26/2010 | | DONE |
|
|
|
fire alarm plans taken to records for scanning
|
INSP-Final Inspection | 1/28/2010 | 1/29/2010 | 1/29/2010 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Alarm Testing | 1/27/2010 | 1/28/2010 | 1/28/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. I stopped at this project several times and found that an external antenna was required to get the required NetCon 5 signal. Data input at the monitoring station had to change zone 2 tamper switches from trouble signals to super visory signals.
|
INSP-Final Inspection | 1/27/2010 | 1/27/2010 | 1/27/2010 | P | CANC |
Troy Cobbley
|
|
|
To be cancelled per Mike since there is no access to the fire alarm panel room.
|
Issue and Print Permit | | | 1/20/2010 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 12/16/2009 | | 12/30/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
12/30/2009 08:42:14 SLC - activity updated through activity FIRA24 from case FIR09-00719.
|
Alarm Plan Check | 12/30/2009 | | 12/30/2009 | | PASS |
Stephanie L. Cobbley
|
|
|
see review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 12/30/2009 | | DONE |
|
|
|
approved plans available at front counter
|
Inspection Record Card- Fire | 12/30/2009 | | 12/30/2009 | | DONE |
|
|
|
|
Telephone call | | | 12/30/2009 | | DONE |
|
|
|
t/c w mike madsen at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 12/30/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/23/2009 | | |
Tisha Gallop
|
|
|
received application and two copies of folder with submittal info and plan sheet FA00; taken to fire review
|
1st review completed | | | 12/18/2009 | | DONE |
|
|
|
|
Alarm Plan Check | 12/18/2009 | | 12/18/2009 | | FAIL |
Stephanie L. Cobbley
|
|
|
AES shown to be used as the FACP which is against code requirements and is not allowed.
|
Telephone call | | | 12/18/2009 | | DONE |
|
|
|
Left Mary Froemke (designer) a message letting her know the plans would have to be denied.
|
Telephone call | | | 12/18/2009 | | DONE |
|
|
|
Spoke to Mike at Peak Alarm to let him know the plans were denied because the AES is shown to be used as the FACP which is against code requirements and is not allowed.
|
Miscellaneous action | | | 12/18/2009 | | DONE |
|
|
|
Faxed a statement to Mike at Peak Alarm with the reasons listed for why the plans failed.
|
Application received | | | 12/16/2009 | | |
|
|
|
|