INSP-Final Inspection | 8/23/2010 | 8/23/2010 | 8/24/2010 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 2/22/2010 | 2/22/2010 | 2/22/2010 | P | NR |
Forrest France
|
|
|
Brian Phone#: ###-####
|
INSP-Conference | 2/2/2010 | 2/2/2010 | 2/2/2010 | A | DONE |
Forrest France
|
|
|
Regarding as-builts for necessary field modifications.
|
INSP-Final Inspection | 1/19/2010 | 1/19/2010 | 1/19/2010 | P | FAIL |
Forrest France
|
|
|
Missing drop ceiling grid and tile at one re-installed head to the east, new equipment install has created an obstructed space behind the new ice machine lacking sprinkler coverage at both the floor and above ceiling areas.
|
Issue and Print Permit | | | 12/18/2009 | | DONE |
|
|
|
|
Application received | | | 12/17/2009 | | |
|
|
|
|
Plan assigned to (Tim) | 12/17/2009 | | 12/17/2009 | | DONE |
Tim Frost
|
|
|
12/17/2009 13:20:29 TRF - activity updated through activity FIRA22 from case FIR09-00721.
|
Sprinkler Plan Check | 12/17/2009 | | 12/17/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are annotations on the plans.
|
1st review completed | | | 12/17/2009 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/17/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 12/17/2009 | | 12/17/2009 | | DONE |
|
|
|
|
Telephone call | | | 12/17/2009 | | DONE |
|
|
|
t/c w damaris at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 12/17/2009 | | DONE |
|
|
|
|