Miscellaneous action | | | 7/28/2010 | | DONE |
|
|
|
FA plans taken to records for scanning.
|
INSP-Final Inspection | 6/7/2010 | 6/8/2010 | 6/8/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Final Inspection | 6/3/2010 | 6/4/2010 | 6/4/2010 | P | FAIL |
Troy Cobbley
|
|
|
The manual pull stations have been corrected. The gas still has not been turned on to the hvac units so they could not be tested and the fire alarm panel is showing a "COMM 1" trouble.
|
INSP-Final Inspection | 6/1/2010 | 6/2/2010 | 6/2/2010 | P | FAIL |
Troy Cobbley
|
|
|
All of the previous corrections have been made. All of the smoke detectors tested and reported as per plan. The manual pull stations tested ok but did not report per plan. Also the heat detector 001 in the closet kept reporting as a trouble even though it was not being tested. Also a Com trouble kept comming up. The duct smoke detectors could not be tested since the gas has not been turned on to the hvac units.
|
INSP-Final Inspection | 6/1/2010 | 6/1/2010 | 6/2/2010 | P | CANC |
Troy Cobbley
|
|
|
Cancelled due to time constraints. Rescheduled for tomorrow.
|
Plan assigned to (Stephanie) | 5/17/2010 | | 5/27/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
5/27/2010 07:19:56 SLC - activity updated through activity FIRA24 from case FIR09-00728.
|
Alarm Plan Check | 5/27/2010 | | 5/27/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
see redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 5/27/2010 | | DONE |
|
|
|
approved redlined plans available at front counter
|
Inspection Record Card- Fire | 5/27/2010 | | 5/27/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 5/27/2010 | | DONE |
|
|
|
t/c w rose at ###-#### - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 5/27/2010 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/27/2010 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/27/2010 | | DONE |
|
|
|
|
Telephone call | | | 5/26/2010 | | DONE |
|
|
|
Called to let Brett know that the calcs are still not correct and requested a revised set.
|
Miscellaneous action | | | 5/26/2010 | | DONE |
|
|
|
Recieved revised calcs
|
Telephone call | | | 5/25/2010 | | DONE |
|
|
|
Spoke with Brett to see when he would be getting the revised calcs to me. He said it would be this afternoon.
|
Miscellaneous action | | | 5/25/2010 | | DONE |
|
|
|
recieved revised battery calculations via email.
|
Miscellaneous action | | | 5/24/2010 | | DONE |
|
|
|
Recieved new calcs and voltage drops per request, however they were not correct.
|
Telephone call | | | 5/24/2010 | | DONE |
|
|
|
Spoke to Brett to let him know the new calcs he sent did not have the correct quantities or values. He stated he would have a revise set to me as soon as possible
|
Telephone call | | | 5/21/2010 | | DONE |
|
|
|
Spoke to Brett and went over the plan device locations (a few of the smoke detector locations are not accurately shown). He asked if I would please cloud and redline the plans indicating the correct locations. I also asked Brett to please email me the battery calculations and voltage drops (they were omitted from the submittal packet).
|
Plan resubmittals received | | | 5/17/2010 | | DONE |
Tisha Gallop
|
|
|
Plan Modification: received application, two folders and plan sheet FA-1; taken to Fire review
|
INSP-Final Inspection | 4/28/2010 | 4/28/2010 | 4/28/2010 | P | FAIL |
Troy Cobbley
|
|
|
Plans need to be resubmitted showing the wall layout changes which will require additional notification device/devices. Several smoke and heat detectors were located less than 3' from supply registers. One strobe on the second level was not set at the correct candella and was corrected while on site. Voltage drops were verified for both of the notification circuits and both circuits checked out ok. The Netcon was verified at a 5 multiple times. All other notication device locations are approved except as noted above due to wall changes.
|
INSP-Conference | 4/6/2010 | 4/7/2010 | 4/7/2010 | P | DONE |
Troy Cobbley
|
|
|
This conference was to discuss the placement of a manual pull station at the center east exit. The request was to place the pull station on a cabinet. That was declined. It was decided that the pull station would be place on the left side door frame, next to the refrigerator. Mounting height was also discussed.
|
INSP-Conference | 4/6/2010 | 4/8/2010 | 4/6/2010 | P | CANC |
Troy Cobbley
|
|
|
Bret Anderson- our office is in Nampa so please give us time to arrive on time to meet you. We will also be calling the contractor to be included in the meeting. Inspection requested from web by: Diane Turner Phone #: ###-#### Inspection cancelled from web by: Diane Turner
|
Override - Parcel Holds | | | 1/22/2010 | | |
|
|
|
|
Issue and Print Permit | | | 1/22/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 1/21/2010 | | 1/21/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
see redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 1/21/2010 | | DONE |
|
|
|
approved redlined plans available at front counter
|
Override - Parcel Holds | | | 1/21/2010 | | |
|
|
|
|
Inspection Record Card- Fire | 1/21/2010 | | 1/21/2010 | | DONE |
|
|
|
|
Telephone call | | | 1/21/2010 | | DONE |
|
|
|
left message w diane for bret at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 1/21/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 1/21/2010 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 12/21/2009 | | 1/21/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
1/21/2010 10:01:27 SLC - activity updated through activity FIRA24 from case FIR09-00728.
|
Plan resubmittals received | | | 1/15/2010 | | |
Stephanie L. Cobbley
|
|
|
rec'd two copies of plans
|
Alarm Plan Check | 1/6/2010 | | 1/6/2010 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans are being rejected due to the building dept. recieving a plan modification that is changing the square footage, adding restrooms etc. that will significantly change the fire alarm plans. I let Bret know that I did not do a review on this re-submittal, therefore the next review will not be considered the 3rd submittal, only the 2nd. He asked that I just discard the plans he re-submitted.
|
Plan resubmittals received | | | 1/5/2010 | | DONE |
|
|
|
|
1st review completed | | | 12/29/2009 | | DONE |
|
|
|
|
Alarm Plan Check | 12/29/2009 | | 12/29/2009 | | FAIL |
Stephanie L. Cobbley
|
|
|
plans denied - see redlined plans and review comments
|
Telephone call | | | 12/29/2009 | | DONE |
|
|
|
spoke to Bret with Mountain Alarm to let him know the plans had failed.
|
Miscellaneous action | | | 12/29/2009 | | DONE |
|
|
|
Faxed review comments to contractor
|
Miscellaneous action | | | 12/29/2009 | | DONE |
Tisha Gallop
|
|
|
picked up denied plans
|
Miscellaneous action | | | 12/28/2009 | | DONE |
|
|
|
Inspector T. Cobbley issued a stop work order due to the fire alarm contractor doing work without a permit
|
Application received | | | 12/21/2009 | | |
|
|
|
|