Miscellaneous action | | | 1/14/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 3/18/2010 | 3/19/2010 | 3/19/2010 | A | PASS |
Forrest France
|
|
|
Remainder of items per latest inspection activity verified for completion, some issues addressed while on site, fire sprinkler permit okay for final.
|
INSP-Final Inspection | 3/17/2010 | 3/18/2010 | 3/18/2010 | A | FAIL |
Troy Cobbley
|
|
|
Forward flush of the backflow needs to be performed, certification of the backflow, service tag on the riser, head box verified.....ect. The interconnection with the fire alarm panel tested ok. I spoke to Doug, the superintendant, and with Tom the building inspector about the need for the one hour riser room. Their are holes in the wall and gaps around all of the exiting piping.
|
INSP-Sprinkler Rough-in | 3/9/2010 | 3/9/2010 | 3/9/2010 | P | PASS |
Troy Cobbley
|
|
|
The rough-in inspection based on the resubmitted/as-builts passed. We could not gain access to the riser room for an inspection there.
|
INSP-Sprinkler Rough-in/Hydro | 3/7/2010 | 3/8/2010 | 3/8/2010 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed
|
Sprinkler Plan Check | 3/8/2010 | | 3/8/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 3/8/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 3/8/2010 | | 3/8/2010 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2010 | | DONE |
|
|
|
t/c w john at ###-#### - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 3/8/2010 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/8/2010 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/8/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/5/2010 | | DONE |
|
|
|
RECEIVED 3 SETS OF RESUBMITTED FIRE PLANS SENT TO TIM F.
|
INSP-Sprinkler Rough-in | 3/1/2010 | 3/2/2010 | 3/2/2010 | A | PART |
Troy Cobbley
|
|
|
Plans need to be resubmitted showing the pipe routing changes and pipe size changes. These changes include the near main being relocated roughly 18' to the south and 3" riser nipples at all branchline/main connection points on both the near and far mains. The sprig ups are marked on the plans to be 1 1/4" but 1 1/2" have been installed. Insulation is laying on the upright sprinkler heads in several locations in the warehouse area. Two office areas near the riser room will have a combustible concealed space above the ceilings but Doug is going to cover with sheet rock. I gave the ok to cover some of the piping in the office area. See the approved plans for exact area.
|
Permit Ready to Issue | | | 1/4/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/4/2010 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 12/24/2009 | | 12/31/2009 | | DONE |
Tim Frost
|
|
|
12/31/2009 11:57:34 TRF - activity updated through activity FIRA22 from case FIR09-00734.
|
Sprinkler Plan Check | 12/31/2009 | | 12/31/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 12/31/2009 | | 12/31/2009 | | DONE |
|
|
|
|
Miscellaneous action | | | 12/30/2009 | | |
|
|
|
picked up denied plans
|
Plan resubmittals received | | | 12/30/2009 | | |
Tim Frost
|
|
|
rec'd 3 sets
|
Sprinkler Plan Check | 12/28/2009 | | 12/28/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/28/2009 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/28/2009 | | DONE |
Tim Frost
|
|
|
Emailed Comments
|
Telephone call | | | 12/28/2009 | | DONE |
|
|
|
t/c w john at ###-#### - permit denied - needs to be picked up and resubmitted
|
Application received | | | 12/24/2009 | | |
|
|
|
|