INSP-Final Inspection | 4/20/2010 | 4/20/2010 | 4/20/2010 | A | PASS |
Forrest France
|
|
|
C/N items finished, final walkthrough passed, fire sprinkler permit finaled.
|
INSP-Final Inspection | 4/19/2010 | 4/19/2010 | 4/19/2010 | P | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 2/22/2010 | 2/22/2010 | 2/22/2010 | P | PART |
Forrest France
|
|
|
Need to repair non-functional flow switch at the existing riser prior to final.
|
INSP-Sprinkler Rough-in | 2/10/2010 | 2/10/2010 | 2/10/2010 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications for the scope of work indicated are satisfactory, okay to cover at the drop and sheetrock ceilings.
|
Issue and Print Permit | | | 2/8/2010 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 12/29/2009 | | 1/4/2010 | | DONE |
Tim Frost
|
|
|
1/4/2010 10:28:31 TRF - activity updated through activity FIRA22 from case FIR09-00738.
|
Sprinkler Plan Check | 1/4/2010 | | 1/4/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are annotations on the plans.
|
1st review completed | | | 1/4/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 1/4/2010 | | 1/4/2010 | | DONE |
|
|
|
|
Telephone call | | | 1/4/2010 | | DONE |
|
|
|
t/c w don at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 1/4/2010 | | DONE |
|
|
|
|
Application received | | | 12/29/2009 | | |
|
|
|
|