Miscellaneous action | | | 3/2/2010 | | DONE |
|
|
|
fire alarm plans taken to records for scanning
|
INSP-Final Inspection | 2/8/2010 | 2/8/2010 | 2/8/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. The monitoring signals had to be modified while I was on site.
|
INSP-Final Inspection | 2/5/2010 | 2/5/2010 | 2/5/2010 | P | FAIL |
Troy Cobbley
|
|
|
After testing all of the devices the monitoring station was contacted and they stated that the account was set up as test only which ment the signals were not correct, building address and call list had not been set up yet. The testing will need to be redone and the signals reverified. All of the devices reported correctly to the fire alarm panel. All three of the duct smoke detectors had been installed backwards and were correctly installed and tested as I waited.
|
CHANGE STATUS TO (ISS) | | | 2/5/2010 | | DONE |
Tisha Gallop
|
|
|
plan mod picked up
|
Plan assigned to (Stephanie) | 1/19/2010 | | 1/22/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
1/22/2010 14:16:38 SLC - activity updated through activity FIRA24 from case FIR09-00741.
|
Alarm Plan Check | 1/22/2010 | | 1/22/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
plan modification passed
|
PLANS TAKEN FRONT DESK ALARM | | | 1/22/2010 | | DONE |
|
|
|
approved plan modification plans available at front counter
|
Telephone call | | | 1/22/2010 | | DONE |
|
|
|
left message with chelsie for patrick at ###-#### - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 1/22/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/19/2010 | | |
Tisha Gallop
|
|
|
Plan Modification: Received application, cut sheets and plan sheets E2.1, E2.2, E2.F; taken to fire review
|
Inspection Record Card- Fire | 1/14/2010 | | 1/14/2010 | | DONE |
|
|
|
|
Telephone call | | | 1/14/2010 | | DONE |
|
|
|
t/c w patrick at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 1/14/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/14/2010 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 12/30/2009 | | 1/13/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
1/13/2010 15:28:40 SLC - activity updated through activity FIRA24 from case FIR09-00741.
|
Miscellaneous action | | | 1/13/2010 | | DONE |
|
|
|
recieved requested information
|
1st review completed | | | 1/13/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 1/13/2010 | | 1/13/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
see review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 1/13/2010 | | DONE |
|
|
|
approved plans available at front counter
|
INSP-Conference | 1/7/2010 | 1/7/2010 | 1/7/2010 | A | DONE |
Troy Cobbley
|
|
|
While onsite performing job related fire sprinkler inspection, noticed the fire alarm vendor had completed installation of fire alarm system without approved plans. Plans are currently under review in the PDS office. NOTE to plans examiner: Work completed without permit.
|
Telephone call | | | 12/31/2009 | | DONE |
|
|
|
Called Pat Gill to remind him to email or fax a site plan and a letter from the engineer stating the design has met the original intent (these items were discussed at the intake meeting). He stated it may be next week before that can be done.
|
Application received | | | 12/30/2009 | | |
|
|
|
|