Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR10-00013
StatusFinaled
Name DOHERTY ELECTRIC
Site Address 7808 W FAIRVIEW AVE
Project NameDEPT OF HEALTH & WELFARE
Customer Number 
ePlanReview 
Description
This fire alarm permit is to provide notification in the waiting area, new hallways created, and interview counters in a new tenant improvement. Also included in this permit scope is the relocation of a pull station in the new hallway and relocation or possible removal of another pull station in the Northeast portion of the waiting area. Notification devices are to be connected to the existing NAC panel located in Vestibule 175.
NOTE TO INSPECTORS: The Benefits Professionals 196 area is not included in this scope of work. A separate fire permit shall be required to accommodate relocating horns etc due to new offices and walls in order to maintain audibility requirements in this area.

Associated building permit: BLD09-00949 (DEPT OF HEALTH & WELFARE) (SOUTH BLDG) (INTERIOR NON-STRUCTURAL DEMO) This building is fire sprinklered for building area increase. To perform interior nonstructural demolition work within a 73,639 square foot building in preparation for new tenant improvement work that will be performed under permit BLD09-00945. Several interior nonbearing partitions, doors, and finishes will be removed. No bearing and/or shear walls are allowed to be removed. New work is NOT allowed under this permit. Demolition of any structural element of this building is NOT allowed under this permit. This permit does NOT establish a Certificate of Occupancy for any tenant. The fire sprinkler system and the fire alarm system shall be maintained functional as required by the Fire Department. The demolition of any element of these systems is NOT allowed without the express approval of the Fire Department. In conjunction with the tenant improvement work under permit BLD09-00945, the fire sprinkler system will be required to be upgraded to comply with current standards, including quick-response sprinklers, in order to avoid enclosed 1-hr fire-resistance-rated corridors. Elements of the existing fire sprinkler system that already comply with current standards may remain without upgrade. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  9/20/2010 DONE
FA plans taken to records for scanning.
INSP-Final Inspection9/7/20109/8/20109/8/2010APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection9/7/20109/7/20109/7/2010PFAIL
DetailsTroy Cobbley
Rob and I went over the map requirements.
INSP-Final Inspection9/1/20109/3/20109/3/2010AFAIL
DetailsTroy Cobbley
Provide approved map with all required information and mount at the facp.
Telephone call  9/3/2010 DONE
Rob Ahten with Protex called regarding the required map indicating an updated/current plan showing the intiating devices. He wanted to know if he was required to provide it even if he did not modify any intiating devices. I let him know that, yes, it would be his responsibility and also pointed to the note on the review comments for this project that indicated as such, and that this permit did involve relocating a pull station. He stated confusion over other projects he said he has not had to do this on. I let him know that in years passed, we have only required an updated map if initiating devices were being modified in the scope of work. But, I let him know that in recent years, the fire department has had trouble with older buildings not having updated maps and that the response times have been hindered. They (the fire department) have requested that every fire alarm permit (regardless of initiating devices being affected or not) address the map being updated. I informed Rob that he should just count on, for every fire alarm permit, updating the map.
CHANGE STATUS TO (ISS)  8/25/2010 DONE
Telephone call  8/18/2010 DONE
Spoke with Rob with Protex and requested a meeting to go over inconsistencies between the originally submitted plans and the plan modification. He indicated he would meet with me this afternoon.
Meeting  8/18/2010 DONE
Met with Rob and determined it was submitted under the wrong permit. Also the plan modification did not reflect the actual installation or reflect the original review comments/redlines. This will require a re-submittal but under FIR09-00638 instead.
CHANGE STATUS TO (ISS)  8/18/2010 DONE
DetailsTisha Gallop
change to Iss status per SLC
Miscellaneous action  8/16/2010 DONE
Recieved two sets of scaled drawings as requested for plan modification
Plan resubmittals received  8/11/2010  
DetailsStephanie L. Cobbley
rec'd 2 sets
FIR-Aging Inspection4/21/20104/21/20104/21/2010 DONE
DetailsTroy Cobbley
work is in progress
Inspection Record Card- Fire1/20/2010 1/20/2010 DONE
Details
Telephone call  1/20/2010 DONE
Details
left message w shanna for mike at ###-#### - permit ready and fees given
Permit Ready to Issue  1/20/2010 DONE
Details
Issue and Print Permit  1/20/2010 DONE
Plan assigned to (Stephanie)1/13/2010 1/19/2010 DONE
DetailsStephanie L. Cobbley
1/19/2010 16:01:27 SLC - activity updated through activity FIRA24 from case FIR10-00013.
1st review completed  1/19/2010 DONE
Alarm Plan Check1/19/2010 1/19/2010 PASS
DetailsStephanie L. Cobbley
see redlines and review comments
PLANS TAKEN FRONT DESK ALARM  1/19/2010 DONE
approved redlined plans available at front counter
Application received  1/13/2010  
Plan assigned to (Stephanie)8/11/2010    
DetailsStephanie L. Cobbley