Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR10-00031
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 2108 S CENTURY WAY
Project NameQUALITY THERMISTOR, INC
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of relocating and adding sprinklers to accommodate new wall and ceiling configuration. There are sprinklers above and below the ceiling.

(Quality Thermistor, Inc) (1-4-10 plan modification to alter an existing shear wall. Work includes hold-downs attached to the concrete floor using epoxy anchors. Special inspection required for epoxy anchor installation.) This building is fully fire sprinklered for building area increase. This building was originally constructed in Ada County and later annexed into the City of Boise. To remodel a 4,770 square foot area within an existing 14,668 square foot building. Work is to include a common single user restroom accessible to the disabled, a private toilet/shower room, interior nonbearing walls, interior doors, interior windows, a 2-hr fire-resistance-rated vault, suspended ceilings, millwork, and finishes. Work also includes a new concrete footing, a tube steel column, and a new post cap to support an existing beam at a new location. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  7/19/2010 DONE
Sent to records for scanning.
INSP-Final Inspection2/23/20102/24/20102/24/2010APASS
DetailsTroy Cobbley
Permit finaled. The extended coverage pendants have been moved to more than 8' apart.
INSP-Sprinkler Rough-in2/9/20102/10/20102/10/2010APART
DetailsTroy Cobbley
The sprinkler piping can be covered. I noted that two of the new extended coverage pendants at the Lobby are less than 8' apart. The solution will be verified at the final inspection. The riser also has a current inspection tag.
Plan assigned to (Tim)1/21/2010 1/22/2010 DONE
DetailsTim Frost
1/22/2010 09:35:40 TRF - activity updated through activity FIRA22 from case FIR10-00031.
Sprinkler Plan Check1/22/2010 1/22/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  1/22/2010 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  1/22/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire1/22/2010 1/22/2010 DONE
Details
Telephone call  1/22/2010 DONE
Details
t/c w jeff anderson at ###-#### - permit ready and fees given
Permit Ready to Issue  1/22/2010 DONE
Details
Issue and Print Permit  1/22/2010 DONE
Details
Application received  1/21/2010  
Pending Assignment by SAM1/21/2010 1/21/2010 DONE
DetailsPatricia Smith
1/21/2010 11:19:15 P_S - activity updated through activity FIRA158 from case FIR10-00031.