Miscellaneous action | | | 4/16/2010 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 3/17/2010 | 3/19/2010 | 3/19/2010 | A | PASS |
Forrest France
|
|
|
Correction items revised, re-testing completed acceptable, as-builts recieved, fire alarm permit finaled.
|
INSP-Final Inspection | 3/18/2010 | 3/18/2010 | 3/18/2010 | P | FAIL |
Troy Cobbley
|
|
|
Trouble signals did not annuciate at the facp as required, battery was not a 8ah, as-builts reflecting the additional flow switch and the two additional tamper switches. Also the order in which the devices were tested was not reflected in the order that the central station received them. Electrician was going to provide the lock for the dedicated circuit. I let Doug know that signage would be required for the riser room/facp room door.
|
Issue and Print Permit | | | 2/8/2010 | | |
|
|
|
|
Plan assigned to (Stephanie) | 2/2/2010 | | 2/5/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
2/5/2010 11:32:53 SLC - activity updated through activity FIRA24 from case FIR10-00049.
|
1st review completed | | | 2/5/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 2/5/2010 | | 2/5/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved - see redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 2/5/2010 | | DONE |
|
|
|
approved redlined plans available at front counter
|
Inspection Record Card- Fire | 2/5/2010 | | 2/5/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/5/2010 | | DONE |
|
|
|
|
Telephone call | | | 2/5/2010 | | DONE |
|
|
|
left vm for bret at ###-#### - permit ready and fees given
|
Application received | | | 2/2/2010 | | |
|
|
|
|