INSP-Final Inspection | 4/27/2010 | 4/28/2010 | 4/28/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 2/24/2010 | 2/26/2010 | 2/26/2010 | A | PASS |
Troy Cobbley
|
|
|
The remaining sprinkler piping can be covered. Permit will be ready to final when the ceiling tile has been installed.
|
INSP-Final Inspection | 2/17/2010 | 2/18/2010 | 2/18/2010 | A | FAIL |
Troy Cobbley
|
|
|
Permit will be ready for a final when the ceiling tile has been installed. Sprinkler piping is ok for cover. I noted that there is another area not shown on the plans that is under construction where sprinkler modifications will be required. Todd was to follow up on this work.
|
Issue and Print Permit | | | 2/9/2010 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 2/3/2010 | | |
|
|
|
|
Plan assigned to (Tim) | 2/3/2010 | | 2/3/2010 | | DONE |
Tim Frost
|
|
|
2/3/2010 15:05:31 TRF - activity updated through activity FIRA22 from case FIR10-00050.
|
Sprinkler Plan Check | 2/3/2010 | | 2/3/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 2/3/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 2/3/2010 | | 2/3/2010 | | DONE |
|
|
|
|
Telephone call | | | 2/3/2010 | | DONE |
|
|
|
left vm for shaun at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 2/3/2010 | | DONE |
|
|
|
|