Permit Information
Permit NumberFIR10-00054
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 4655 S ENTERPRISE ST
Project NameAIRPORT CUSTOMS
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of installing 160'± of 4" C-900 underground with a yard post indicator valve to protect a new building. The sprinkler system is designed for ordinary hazard group I. There is also double interlock preaction system protecting a computer room. The main building system is a straight gut system with a backflow preventer. The main building system is designed as a tree with 2 ½" mains and 1 ¼" lines. The fire department connection is remote from the main riser and is located on the front of the building. A new hydrant is to be installed by others within 300' of the FDC. There are several outside canopies that are non-combustible and do not required fire protection. Therefore there are to be no combustibles stored or handled below these canopies.

Boise Airport - Customs and Border Protection Facility - To construct a new 5,145 square foot, one story Customs and Boarder Protection small plane international flight customs terminal. This terminal will be constructed of masonry exterior walls with steel structural roof and interior frame construction. This permit will also include related site improvements. This building will be fully fire sprinklered. There is an existing warehouse building that is being demolished and removed at the building site. The demolition is being done under permit BLD09-00404. All construction per the approved plans and attached comment list. DRH08-00377 JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  1/14/2011 DONE
Sent to records for scanning.
INSP-Final Inspection10/25/201010/27/201010/28/2010APASS
DetailsForrest France
fire sprinkler permit final approved.
INSP-Final Inspection10/21/201010/22/201010/22/2010ACANC
DetailsTroy Cobbley
Jeff and I spoke and agreed the inspection would be canceled due to the project related fire alarm drawings not being issued yet. Without approved drawings the interconnections will not be tested. Inspection to be rescheduled.
INSP-Alarm Testing10/21/201010/22/201010/22/2010ACANC
DetailsTroy Cobbley
Jeff and I spoke and agreed the inspection would be canceled due to the project related fire alarm drawings not being issued yet. Without approved drawings the interconnections will not be tested. Inspection to be rescheduled.
INSP-Final Inspection10/19/201010/20/201010/20/2010PDEFR
DetailsForrest France
Not ready for final per contractor.
INSP-Sprinkler Rough-in/Hydro8/25/20108/25/20108/26/2010PPART
DetailsForrest France
Concluded satisfactory pneumatic test of the new preaction system with no pressure loss at the guage.
INSP-Sprinkler Rough-in/Hydro8/24/20108/24/20108/24/2010PPART
DetailsForrest France
Hydrostatic test of the overhead wet system passed. Begin 24 hour pneumatic test of the new preaction system @ 11:45 AM 42psig.
INSP-Sprinkler Rough-in/Hydro8/23/20108/23/20108/23/2010PPART
DetailsForrest France
Overhead work at the grid ceilings is approved for cover. Hydrostatic test of the new preaction system passed. Wet system hydro incomplete.
INSP-Sprinkler Rough-in/Hydro7/29/20107/29/20107/29/2010APART
DetailsForrest France
Okayed for cover at areas per activity notes and annotations on the stamped plans.
INSP-Sprinkler Rough-in7/15/20107/15/20107/15/2010PPART
DetailsForrest France
Okayed overhead modification at the janitors room and the preaction system tie-in above the sheetrock lid.
INSP-Sprinkler Rough-in7/13/20107/13/20107/13/2010PPART
DetailsForrest France
Overhead fire sprinkler work is approved for cover at the sheetrock ceilings.
INSP-Sprinkler Rough-in6/14/20106/15/20106/15/2010APART
DetailsForrest France
Okay to cover FDC piping at wall and one closet at the north side.
INSP-Sprinkler Rough-in5/26/20105/26/20105/27/2010PPART
DetailsForrest France
Overhead install is approved for cover at four rooms as marked on stamped plan set with today's date. Some areas not yet finished including the FDC, riser, preaction riser, heads in drop ceilings, etc. Preliminary rough-in inspection at this time only.
Miscellaneous action  3/10/2010 DONE
The underground has been separated into a different permit FIR10-00100
INSP-Sprinkler Rough-in3/2/20103/2/20103/2/2010PPART
DetailsForrest France
Underground fire supply line and stub-in including the ductile riser, two thrust blocks and two lengths of C-900 outside the new building as marked on approved plans are okay for bury.
Issue and Print Permit  2/16/2010 DONE
Plan assigned to (Tim)2/11/2010 2/12/2010 DONE
DetailsTim Frost
2/12/2010 11:51:43 TRF - activity updated through activity FIRA22 from case FIR10-00054.
Sprinkler Plan Check2/12/2010 2/12/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  2/12/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire2/12/2010 2/12/2010 DONE
Details
Telephone call  2/12/2010 DONE
Details
left vm for chris at ###-#### - permit ready and fees given
Permit Ready to Issue  2/12/2010 DONE
Miscellaneous action  2/11/2010 DONE
picked up denied plans
Plan resubmittals received  2/11/2010  
DetailsTisha Gallop
received application and three copies of binder of data sheets and plan sheets FP1, FP2; taken to fire review
Sprinkler Plan Check2/10/2010 2/10/2010 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  2/10/2010 DONE
DetailsTim Frost
Miscellaneous action  2/10/2010 DONE
Emailed comments
Telephone call  2/10/2010 DONE
Details
left vm for chris wilson at ###-#### - permit denied - needs to be picked up and resubmitted
Application received  2/9/2010