Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR10-00060
StatusFinaled
Name TRI STATE ELECTRIC
Site Address 4610 W HILLCREST DR
Project NameHillcrest Country Club
Customer Number 
ePlanReview 
Description
This fire alarm permit is to provide a new manual fire alarm system in an existing building and extend throughout an addition. Included in this permit scope are; a pull station, full notification, kitchen hood suppression system monitoring, sprinkler system monitoring, and HVAC monitoring/shutdown.

Associated building permit: BLD09-00980 Hillcrest Country Club - Phase I Addition and Remodel - Phase I includes remodel of the entire building on the west side of the fire wall, plus 750 square feet on the east side of the fire wall (everything west of grid line S). To demo and remove the structure at the Garden Court areas. To demo and removed most of the interior partitions, ceilings and finishes, except at Mech/Elect Room #124 and the stairways. Demo and remove a large portion of the west exterior wall, planters and exterior stairways. To construct a new 4,150 sq. ft. basement and 3,875 sq. ft., wood framed first floor addition on the west end of the existing club house building. To construct new covered patio and entry areas. To refinish the interior to include new men's and women's lounges, showers, locker rooms and restrooms, new golf shop, fitness area, kitchen and bar/dining area. There is a two-hour, masonry fire wall constructed at grid line Q. The area of the Phase I project is 18,900 square feet with a 11,900 square foot basement. This building is fully fire sprinkled. The sprinklers are used for area increase. The area on the west side of the fire wall is 18,150 sq. ft. with an 11,900 sq. ft. basement; the area on the east side of the fire wall is 21,710 sq. ft. with a 1,535 sq. ft. basement. This permit is for Phase I of the project only. A separate tenant improvement permit will be required to finish Phase II. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  7/28/2010 DONE
FA plans taken to records for scanning.
INSP-Final Inspection7/27/20107/27/20107/27/2010PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Alarm Testing5/27/20105/28/20105/28/2010ADONE
DetailsTroy Cobbley
Phase I fire alarm is complete.
INSP-Alarm Testing5/26/20105/27/20105/27/2010ACANC
DetailsTroy Cobbley
Rescheduled for tomorrow morning
INSP-Alarm Testing5/25/20105/26/20105/26/2010ADONE
DetailsTroy Cobbley
The items previously listed have been corrected. Duct smoke detectors have been tested for hvac shutdown. EOL voltage was verified. Two smoke detectors were tested for operation that operate roll down fire doors. They were not approved for location only for function. They are not shown on the city approved plans. They are to be included on the revised plans. Items remaining for phase I include the 135cd strobe and the repair of the corridor roll down fire door.
INSP-Alarm Testing5/24/20105/24/20105/24/2010PDONE
DetailsTroy Cobbley
Some of the phase I items were tested today. They included verification of the FACP model, telephone line numbers and troubles, facp battery trouble and interconnection with the NAC in the phase I basement. Spacing and operation of the phase I a/v's were also tested. A weather proof back box is needed at the cart ramp, add a strobe in the dressing room, provide a 135cd strobe in the outside dining area and provide the corrected sample tubes for the duct smoke detectors. The a/v's will need to be retested and EOL verified, test the duct smoke detectors for hvac shutdown, test the new smoke detectors and pull station.
INSP-Alarm Testing5/13/20105/14/20105/14/2010APASS
DetailsTroy Cobbley
The fire alarm system in Phase 2 pool/restrooms is complete and tested ok. Additional strobe were required/added in the showers and restoom stalls. They will need to be shown on the resubmitted plans or as-builts which ever case it may be.
INSP-Alarm Testing5/11/20105/12/20105/12/2010PFAIL
DetailsTroy Cobbley
Todays inspection was for the five rooms at the pool area. They include locker/showers and restrooms. The visual coverage is inadequate due to alot of shadowing. It appears that atleast seven additional strobes are going to be required. EOL will need to be verified on this circuit when the fire alarm system installation has been completed.
Issue and Print Permit  2/25/2010 DONE
Alarm Plan Check2/24/2010 2/24/2010 PASS
DetailsStephanie L. Cobbley
see redlines and review comments
PLANS TAKEN FRONT DESK ALARM  2/24/2010 DONE
approved redlined plans available at front counter
Inspection Record Card- Fire2/24/2010 2/24/2010 DONE
Details
Telephone call  2/24/2010 DONE
t/c w shelly at ###-#### - permit ready and fees given
Permit Ready to Issue  2/24/2010 DONE
Details
Plan assigned to (Stephanie)2/10/2010 2/24/2010 DONE
DetailsStephanie L. Cobbley
2/24/2010 13:16:00 SLC - activity updated through activity FIRA24 from case FIR10-00060.
Plan resubmittals received  2/18/2010  
DetailsTisha Gallop
received one plan sheet inserted into plans by Protex rep.//taken to fire review
Miscellaneous action  2/17/2010 DONE
Faxed review comments to Protex as no fax number was provided for the applicant.
Plan resubmittals received  2/17/2010  
DetailsStephanie L. Cobbley
1st review completed  2/17/2010 DONE
Alarm Plan Check2/17/2010 2/17/2010 FAIL
DetailsStephanie L. Cobbley
See redlines and review comments
Miscellaneous action  2/17/2010 DONE
redlined plans available at front counter for contractor to pick up
Telephone call  2/16/2010 DONE
Spoke to Rob with Protex and let him know that I could either reject the plans, he can pick them up, revise them, and resubmit (one permit fee); or I could go ahead and approve them but that he would need to resubmit a plan modification prior to calling for a final inspection (two permit fees). He opted to have me reject the plans.
Application received  2/10/2010