Miscellaneous action | | | 7/28/2010 | | DONE |
|
|
|
FA plans taken to records for scanning.
|
INSP-Final Inspection | 7/2/2010 | 7/6/2010 | 7/6/2010 | A | PASS |
Forrest France
|
|
|
Notification and voice evac circuts and appliances tested satisfactory, verified plan resubmittals for field modifications, corrections per last site visit finished. Fire alarm permit finaled.
|
(F) Reprint permit | | | 7/2/2010 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/2/2010 | | |
|
|
|
|
Plan assigned to (Stephanie) | 6/28/2010 | | 7/1/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
7/1/2010 14:58:18 SLC - activity updated through activity FIRA24 from case FIR10-00061.
|
Alarm Plan Check | 7/1/2010 | | 7/1/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved
|
PLANS TAKEN FRONT DESK ALARM | | | 7/1/2010 | | DONE |
|
|
|
approved plans available at front counter
|
Inspection Record Card- Fire | 7/1/2010 | | 7/1/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 7/1/2010 | | DONE |
|
|
|
left vm for ken at ###-#### - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 7/1/2010 | | DONE |
|
|
|
|
Telephone call | | | 6/29/2010 | | DONE |
|
|
|
Spoke to Lee and requested a new one-line riser diagram as it does not match the plans.
|
Plan resubmittals received | | | 6/29/2010 | | |
Stephanie L. Cobbley
|
|
|
rec'd 2 sets
|
INSP-Final Inspection | 6/14/2010 | 6/21/2010 | 6/18/2010 | A | CANC |
Forrest France
|
|
|
Call Lee ###-#### Inspection requested from web by: Mike Brown Phone #: ###-#### Inspection cancelled from web by: Mike Brown
|
INSP-Final Inspection | 5/28/2010 | 6/2/2010 | 6/2/2010 | A | FAIL |
Forrest France
|
|
|
Items not repaired and included on the original inspection correction list include the duct detector at "Taters", missing signage at the door to the FACP room, sprinkler tamper switch must report as a supervisory condition. Also noted a trouble on the panel at one beam detector, overspaced and missing notification at the mechanical mezzanine, walkthrough completed for area B. Attempted an expedited test of the building alarm notification circuts by providing an additional inspector on site- test failed due to non-functional voice evacuation speakers at the main convention hall. A re-inspection fee will apply to the next site visit, see permit conditions for details.
|
INSP-Final Inspection | 5/27/2010 | 5/28/2010 | 5/27/2010 | A | DEFR |
Forrest France
|
|
|
Mike Phone #: ###-#### Note: request intended for a different date per phone conversation.
|
INSP-Final Inspection | 5/17/2010 | 5/24/2010 | 5/25/2010 | A | FAIL |
Forrest France
|
|
|
Correction items for areas inspected to date include; HVAC duct smoke detector at address L2-S29 in concessions room 210 "Perch" failed to initiate unit shut down- plan sheet F.A.2.1, duct smoke detector address L1-S29 in "Tators" failed to shut down HVAC unit, missing tamper switch and monitor module at the outside control valve for the fire sprinkler system- F.A. 2.3/2.0, missing one notification appliance at exhibit hall 200- sheet F.A.2.5, post signage at the door to the FACP room per review notes, notification devices have been changed from wall mount to ceiling mount at the restrooms F.A.2.5, incorrect cd setting at lockers 179, minor adjustments to as-built plans discussed, need clarification of room use at the "business center" area D as is lacking notification. Items inspected include kitchen hood monitoring, fire sprinkler riser supervision, heat detectors, manual pull station, area smoke detection at the basement, all duct detectors, door holds, walkthrough regarding notification appliance locations for areas A, C and D.
|
Telephone call | | | 5/10/2010 | | DONE |
|
|
|
Lee with Allied General called regarding existing combination smoke/door holders that no longer function. They are going to use detection and wall door holders rather than replace with newer combination devices due to cost and availability. Because the doors are those serving the kitchen, Lee asked if heat detectors would be allowed to be used on the kitchen side with smoke detectors on the corridor side. The door holders would be closed on general alarm. I let him know the heat detectors would be allowed in this case. I also let him know that, while it would ultimately be the inspector's decision, that these smoke and heat detector additions could be indicated on as-built plans provided at the final inspection instead of needing to submit a plan modification. I also mentioned that if other changes were made, it may prompt a plan modification.
|
Plan assigned to (Stephanie) | 2/11/2010 | | 2/24/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
2/24/2010 10:51:50 SLC - activity updated through activity FIRA24 from case FIR10-00061.
|
1st review completed | | | 2/24/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 2/24/2010 | | 2/24/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
Passed with conditions (A plan modification will be required upon completion of installation): There are significant redlines on the plans that exceed the allowed amount for field verification but are not extensive enough to require a re-submittal. Upon completion of the fire alarm installation, a plan modification shall be submitted to the city, with approval obtained, prior to calling for a final inspection. The plan modification shall include implementation of the following review comments and redlines on the drawings, as well as any as-built conditions.
|
PLANS TAKEN FRONT DESK ALARM | | | 2/24/2010 | | DONE |
|
|
|
approved redlined drawings available at front counter
|
Inspection Record Card- Fire | 2/24/2010 | | 2/24/2010 | | DONE |
|
|
|
|
Telephone call | | | 2/24/2010 | | DONE |
|
|
|
t/c w joe at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 2/24/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/24/2010 | | DONE |
|
|
|
|
Telephone call | | | 2/23/2010 | | DONE |
|
|
|
Spoke to Joe to go over questions on the drawings. He is going to email me a clarification for the notification in the basement. I let him know that the comments I will have on the drawings will be too great to allow a field verification, so I either need to reject them and have them resubmitted (essentially one set of review fees), or I could approve them with the understanding a plan modification would need to be submitted when the installation is complete, but prior to calling for a final inspection (two sets of review fees). He opted to have me approve them and they understand they will need to submit a plan modification prior to calling for a final inspection.
|
Miscellaneous action | | | 2/18/2010 | | DONE |
|
|
|
Recieved an email from Joe at Allied General requesting that I swap review order with another one of their projects FIR09-00516. I emailed him back approving his request.
|
Application received | | | 2/11/2010 | | |
|
|
|
|