Permit NumberFIR10-00072
StatusFinaled
Name CURTIS FIRE SPRINKLER SERVICE INC
Site Address 10464 W GARVERDALE CT
Project NameCENTER FOR SPIRITUAL LIVING
Customer Number 
ePlanReview 
Description
Fire Work Scope:

The Fire Sprinkler Scope of work consists of adding fire protection to an existing wood frame structure. The wet system is designed as a loop. There is an unsprinklered crawl space and stage. Most of the system has above and below protection.

(CENTER FOR SPIRITUAL LIVING) This building will be fully fire sprinklered for the occupant load in the fire area. To convert an existing 7,108 square foot office building (B Occupancy) to a church (A-3 Occupancy). Nonstructural work includes 2 restrooms accessible to the disabled, an interior ramp accessible to the disabled, interior nonbearing walls, interior doors, interior windows, exterior windows, and finishes. Structural work includes a new roof structure, bearing walls, beams, columns, headers, shear walls, joists, concrete footings, etc. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and standards. The new fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Interior nonstructural demolition was done under permit BLD10-00038. Planning approvals done under CUP09-00054, DRH09-00208, & DRH09-00281. **CJW**

________________________________________

Notice:

The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to comply with the code. These changes may affect the sprinkler system. The sprinkler contractor will be required to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit; they will do so on their own cognizance.
" 8/10/2010 The notice above no longer pertains since the permit was issued 06-15-10.

________________________________________


Plan Mod Scope of Work:

Changed four upright sprinklers to sidewall sprinklers per the owners request in the high area of the sanctuary.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  6/8/2011 DONE
Sent to records for scanning.
INSP-Final Inspection3/29/20113/30/20113/30/2011APASS
DetailsTroy Cobbley
permit finaled
FIR-Aging Inspection3/29/20113/29/20113/30/2011 PASS
DetailsTroy Cobbley
INSP-Final Inspection1/27/20111/27/20111/27/2011PPART
DetailsTim Frost
This inspection was called in under the wrong permit BLD10-00114.

The exterior canopy was inspected. The canopy is completely filled with non-combustible insulation. I gave then the ok to cover the canopy with hardy board. Therefore no sprinkler was required.
Inspection1/28/20111/27/20111/27/2011APART
DetailsTim Frost
Miscellaneous action  1/3/2011 DONE
Received a letter from John McCarthy with Eireannach. Indicating that all exposed surfaces of the entrance foyer will be non-combustible therefore, not requiring a sprinkler. He also indicated and reemphasized that the attic space must be entirely filled with non combustible insulation. I also, mentioned in the email that a space must be left open in the canopy so that the field inspector may be to able to visually veify the space. Please, see the case file for details.
INSP-Final Inspection12/8/201012/8/201012/8/2010PPART
DetailsTroy Cobbley
A temporary occupancy was given, with Scott's permission, until the front entry canopy is complete and the additional fire sprinkler is installed.
INSP-Final Inspection12/2/201012/3/201012/3/2010AFAIL
DetailsTroy Cobbley
Need to perform a job walk through and verify there are no head obstructions, need all of the final items at the riser such as backflow certification, head box, stickers...ect. Also noted that a pendant head was installed in the electrical room but a ceiling had not been installed.
INSP-Supply line flush12/2/201012/3/201012/3/2010APASS
DetailsTroy Cobbley
supply line flush passed.
INSP-Sprinkler Rough-in12/2/201012/3/201012/3/2010APASS
DetailsTroy Cobbley
The underground flush passed and the forward flush test of the backflow preventor passed.
INSP-Sprinkler Rough-in/Hydro12/2/201012/2/201012/2/2010PPASS
DetailsTroy Cobbley
The overhead hydro passed.
INSP-Sprinkler Rough-in/Hydro10/19/201010/20/201010/20/2010APASS
DetailsTroy Cobbley
The under ground hydro passed. No flush was performed.
INSP-Sprinkler Rough-in10/14/201010/15/201010/15/2010APASS
DetailsTroy Cobbley
The underground supply piping is ok to cover.
Override - Parcel Holds10/14/20101/1/190010/14/2010  
fire only
INSP-Sprinkler Rough-in8/25/20108/25/20108/25/2010PPASS
DetailsTroy Cobbley
The sprinkler piping in the high ceiling area, as discussed, can be covered.
INSP-Sprinkler Rough-in/Hydro8/19/20108/19/20108/19/2010PPASS
DetailsTroy Cobbley
Piping rough-in passed except for the two clouded areas marked on the plan in red where the piping has not been installed yet. Also one upright head is blocked by truss web members and is to be relocated as discussed. As-built plans will be required showing the piping routing changes. A hydro test was not performed since the upright needs relocated and none of the permanant sprinkler pendants/sidewalls have been installed. Branch line restraints have not been installed and the longitudinal earthquake bracing has not been installed. The insulation will be required to be installed at the deck since the upright sprinkler heads are located too far below the wood deck.
CHANGE STATUS TO (ISS)  8/19/2010  
(F) Reprint permit  8/19/2010  
Plan assigned to (Tim)8/10/2010 8/11/2010 DONE
DetailsTim Frost
8/11/2010 13:46:34 TRF - activity updated through activity FIRA22 from case FIR10-00072.
Plan resubmittals received  8/11/2010  
received 3 sets of plans/applications sent to Tim Frost for review
Sprinkler Plan Check8/11/2010 8/11/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  8/11/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire8/11/2010 8/11/2010 DONE
DetailsPatricia Smith
Telephone call  8/11/2010 DONE
t/c w don at ###-#### - permit (plan mod) ready and fees given
Permit Ready to Issue  8/11/2010 DONE
Details
Sprinkler Plan Check8/10/2010 8/10/2010 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  8/10/2010 DONE
DetailsTim Frost
Telephone call  8/10/2010 DONE
t/c w don at ###-#### - permit (plan mod) denied - needs to be picked up and resubmitted
Plan resubmittals received  8/10/2010 DONE
DetailsTisha Gallop
Plan Modification: Received three copies of application, submittal documents and plans; taken to Fire Review
FIR-Aging Inspection7/9/20107/9/20107/9/2010 NR
DetailsTroy Cobbley
Work is in progress
Issue and Print Permit  3/11/2010 DONE
Sprinkler Plan Check3/10/2010 3/10/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  3/10/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire3/10/2010 3/10/2010 DONE
Details
Telephone call  3/10/2010 DONE
Details
t/c w don at ###-#### - permit ready and fees given
Permit Ready to Issue  3/10/2010 DONE
Details
Plan resubmittals received  3/9/2010 DONE
received 4 resumittal plans and apps sent to Tim Frost
Sprinkler Plan Check3/4/2010 3/4/2010 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Miscellaneous action  3/4/2010 DONE
Emailed 2nd review
Telephone call  3/4/2010 DONE
Details
t/c w don at ###-#### - permit denied - needs to be picked up and resubmitted
Plan resubmittals received  3/2/2010  
DetailsTim Frost
received four copies of application, checklist, submittal documents and plan sheets FP-01, FP-02; taken to fire review
Plan assigned to (Tim)2/18/2010 2/19/2010 DONE
DetailsTim Frost
Sprinkler Plan Check2/19/2010 2/19/2010 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  2/19/2010 DONE
DetailsTim Frost
Miscellaneous action  2/19/2010 DONE
Emailed comments
Telephone call  2/19/2010 DONE
Details
t/c w don at ###-#### - permit denied - needs to be picked up and resubmitted
Application received  2/18/2010  
Pending Assignment by SAM2/18/2010 2/18/2010 DONE
DetailsAlexandra L. DeYoung
2/18/2010 13:50:30 ALR - activity updated through activity FIRA158 from case FIR10-00072.