Permit Information
Permit NumberFIR10-00073
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 1055 N CURTIS RD
Project NameSARMC CLINICAL LAB RENOVATION
Customer Number 
ePlanReview 
Description
1/4/11: PLAN MODIFICATION (no initiating devices affected). This plan modification is to relocate and add notification to accommodate lab stations obstructing the effects of the devices.

2/26/10: This fire alarm permit is to provide smoke detectors, in-duct detectors, duct detectors, door holder connections, and chime/strobes to accommodate a tenant remodel. A new NAC panel is included in this permit scope to accommodate the new chime/strobes.

Associated building permit: BLD09-02069 (ST ALPHONSUS - CLINICAL LABORATORY RENOVATION) Renovation of existing Clinical Laboratory Department to accommodate the installation of an automatic testing line and relocation of the Histology and Cytology Departments. Work will include selective interior demolition in five different phases in conjunction with five phases of tenant remodel to allow Lab functions to continue. In order to maintain operation requirements of the Lab some existing rooms in the immediate Lab Clinic area will receive minimum modifications to facility maintaining use of equipment and work stations for lab activities while their portion of the clinic is demolished and remodeled. At the conclusion of the remodel all activities and support functions will be within the existing Clinical Lab and expanded Histology and Cytology Departments in the SE corner of the 1st floor of SARMC. Work includes construction of new non-bearing walls to create work / testing areas, relocation of existing walk-in cooler; relocation / construction of existing 2-hour fire barrier wall on west and north sides of new Cytology Dept.; structural modification for new door opening in concrete wall between Histology 101 & Cytology 103 (see 8-1/2" xx 11" structural design and details); and upgrades of electrical, mechanical, plumbing, sprinkler and alarm systems to meet tenant needs and provide / maintain code compliance. Drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  2/8/2011 DONE
Plans taken to records for scanning.
INSP-Final Inspection1/28/20112/1/20112/1/2011APASS
DetailsTroy Cobbley
Permit finaled
(F) Reprint permit  1/5/2011 DONE
CHANGE STATUS TO (ISS)  1/5/2011  
Plan assigned to (Stephanie)12/28/2010 1/4/2011 DONE
DetailsStephanie L. Cobbley
Alarm Plan Check1/4/2011 1/4/2011 PASS
DetailsStephanie L. Cobbley
Plan modification approved - see review comments
PLANS TAKEN FRONT DESK ALARM  1/4/2011 DONE
Approved plan modification plans available at front counter
Inspection Record Card- Fire1/4/2011 1/4/2011 DONE
DetailsPatricia Smith
Telephone call  1/4/2011 DONE
t/c w charlie - permit (plan mod) ready and fees given
Permit Ready to Issue  1/4/2011 DONE
Details
Plan resubmittals received  12/28/2010 DONE
DetailsTisha Gallop
Plan Modification: received two copies of application, submittal binder and plans; taken to Fire review.
INSP-Final Inspection12/15/201012/16/201012/16/2010AFAIL
DetailsTroy Cobbley
The plans need to be re-submitted for plan modifications, as per the red note by the plan reviewer, since the partitions/shelves exceed 6'-0" in height. I went ahead and tested the smoke detectors which passed inspection.
FIR-Aging Inspection11/25/201011/25/201012/2/2010 NR
DetailsTroy Cobbley
work is in progress
INSP-Sprinkler Rough-in5/14/20105/18/20105/18/2010APASS
DetailsTroy Cobbley
The fire alarm in phase two passed inspection
INSP-Final Inspection4/8/20104/8/20104/8/2010PPART
DetailsTroy Cobbley
The phase 1 fire alarm testing is passed.
INSP-Sprinkler Rough-in4/6/20104/7/20104/7/2010AFAIL
DetailsTroy Cobbley
This inspectio was for phase 1. All items tested ok except for the duct detector located in the main existing exit corridor did not shut down the hvac unit when activated.
Issue and Print Permit  3/1/2010 DONE
1st review completed  2/26/2010 DONE
Alarm Plan Check2/26/2010 2/26/2010 PASS
DetailsStephanie L. Cobbley
approved with redlines and review comments
PLANS TAKEN FRONT DESK ALARM  2/26/2010 DONE
approved redlined plans available at front counter
Miscellaneous action  2/26/2010 DONE
recieved an email with a pdf document of the letter signed by the engineer.
Inspection Record Card- Fire2/26/2010 2/26/2010 DONE
Details
Telephone call  2/26/2010 DONE
Details
left vm for charlie at ###-#### - permit ready and fees given
Permit Ready to Issue  2/26/2010 DONE
Details
Telephone call  2/25/2010 DONE
Left a message for Charlie Bayne letting him know that the letter provided (stating compliance with design intent) was signed by an electrical designer, however a PE was listed as the designer on the permit applications. I stated that I either need a new letter signed by the engineer listed on the permit application, or the electrical designers qualifications (i.e. NICET cert., factory trained, etc...) need to be provided and he needs to be listed as the designer.
Telephone call  2/25/2010 DONE
Charlie returned my phone call and said that he would try to have the new letter to me by tomorrow.
Application received  2/18/2010  
Plan assigned to (Stephanie)2/18/2010 2/18/2010 DONE
DetailsDarla L Downs