INSP-Final Inspection | 6/22/2010 | 6/22/2010 | 6/22/2010 | P | PASS |
Forrest France
|
|
|
Scope of fire sprinkler work passed final walkthrough, permit finaled.
|
INSP-Sprinkler Rough-in | 3/4/2010 | 3/5/2010 | 3/5/2010 | A | PART |
Forrest France
|
|
|
Overhead rough-in approved for cover, final pending ceiling install at the equipment booth and tile in the grid ceilings.
|
Permit Ready to Issue | | | 3/4/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/4/2010 | | DONE |
|
|
|
|
Application received | | | 3/2/2010 | | |
|
|
|
|
Sprinkler Plan Check | 3/2/2010 | | 3/2/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 3/2/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 3/2/2010 | | 3/2/2010 | | DONE |
|
|
|
|
Pending Assignment by SAM | 3/2/2010 | | | | |
|
|
|
|