Miscellaneous action | | | 7/19/2010 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 4/12/2010 | 4/13/2010 | 4/13/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 4/2/2010 | 4/5/2010 | 4/5/2010 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed and the earth quaking has been modified and trapeze hangers provided on the mains.
|
INSP-Sprinkler Rough-in | 3/29/2010 | 3/30/2010 | 3/31/2010 | A | PART |
Troy Cobbley
|
|
|
The piping rough-in in general is passed. Trapeze hangers are required for the new 3" supply main since all of its weight is hanging from a single Z purlin and the earthquake bracing needs to be anchored at the beams as discussed with Roy. The overhead hydro test failed since a visable leak was found at a pendant and the 3" supply main had not been included in the test.
|
Issue and Print Permit | | | 3/11/2010 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 3/5/2010 | | 3/10/2010 | | DONE |
Tim Frost
|
|
|
3/10/2010 14:20:05 TRF - activity updated through activity FIRA22 from case FIR10-00096.
|
Plan resubmittals received | | | 3/10/2010 | | DONE |
|
|
|
received 1 checklist,3 paas and 4 plans sent to Tim F.
|
Sprinkler Plan Check | 3/10/2010 | | 3/10/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 3/10/2010 | | 3/10/2010 | | DONE |
|
|
|
|
Telephone call | | | 3/10/2010 | | DONE |
|
|
|
t/c w bernie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/10/2010 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/5/2010 | | 3/5/2010 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 3/5/2010 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 3/5/2010 | | DONE |
|
|
|
LM for John - permit is denied
|
Application received | | | 3/5/2010 | | |
|
|
|
|