Miscellaneous action | | | 9/8/2010 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 9/2/2010 | 9/2/2010 | 9/2/2010 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 6/23/2010 | 6/23/2010 | 6/24/2010 | P | PART |
Forrest France
|
|
|
To confirm work in progress for vanilla building permit final BLD10-00508.
|
INSP-Sprinkler Rough-in | 6/22/2010 | 6/22/2010 | 6/22/2010 | P | PART |
Forrest France
|
|
|
Verified deluge valve demo per clouded plan notes.
|
Plan assigned to (Tim) | 6/17/2010 | | 6/18/2010 | | DONE |
Tim Frost
|
|
|
6/18/2010 09:39:14 TRF - activity updated through activity FIRA22 from case FIR10-00146.
|
Sprinkler Plan Check | 6/18/2010 | | 6/18/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 6/18/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2010 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/18/2010 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 6/18/2010 | | DONE |
|
|
|
Called Broadie and told him permit is ready and fees due on 6-18-10 @ 10:05am BAS
|
Inspection Record Card- Fire | 6/18/2010 | | 6/18/2010 | | DONE |
Barbara Stitt
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/18/2010 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/18/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/17/2010 | | |
Tim Frost
|
|
|
rec'd 3 sets
|
INSP-Sprinkler Rough-in | 6/14/2010 | 6/14/2010 | 6/14/2010 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler coverage in space 108, east tenant space, has been corrected. Still need revised plans that match the installation.
|
INSP-Sprinkler Rough-in | 6/10/2010 | 6/10/2010 | 6/10/2010 | P | FAIL |
Troy Cobbley
|
|
|
Sprinkler heads are overspaced and the installation doesn't match plasn. Per Jeff Packam this project was not ready for inspection. I also found an existing deluge valve that is not connected to the fire alarm system and is missing an air compressor. I let the general contractor, Camco, know that this equipment needs to be functional prior to any sign offs for his permit.
|
Plan assigned to (Tim) | 4/2/2010 | | 4/8/2010 | | DONE |
Tim Frost
|
|
|
4/8/2010 13:12:36 TRF - activity updated through activity FIRA22 from case FIR10-00146.
|
Sprinkler Plan Check | 4/8/2010 | | 4/8/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/8/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 4/8/2010 | | 4/8/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 4/8/2010 | | DONE |
|
|
|
left vm for brodie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 4/8/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/8/2010 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/7/2010 | | 4/7/2010 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 4/7/2010 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 4/7/2010 | | DONE |
|
|
|
Emailed review
|
Telephone call | | | 4/7/2010 | | DONE |
|
|
|
left vm for brodie at ###-#### - permit denied - needs to be picked up and resubmitted
|
Plan resubmittals received | | | 4/7/2010 | | |
Barbara Stitt
|
|
|
|
Application received | | | 4/2/2010 | | |
|
|
|
|
Pending Assignment by SAM | 4/2/2010 | | 4/2/2010 | | DONE |
Alexandra L. DeYoung
|
|
|
4/2/2010 15:37:14 ALR - activity updated through activity FIRA158 from case FIR10-00146.
|