Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR10-00155
StatusFinaled
Name CURTIS FIRE SPRINKLER SERVICE INC
Site Address 1070 N CURTIS RD Unit: 240
Project NameBoise Endodontics Suite 240
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of relocating and removing sprinklers for a tenant improvement. The existing system is a tree type system.

(Boise Endodontics) Suite 240 - To remodel an existing 2,368 square foot tenant space for a new tenant on the 2nd floor of this existing building. Work to include: selective demolition of interior nonbearing walls; construction of new partition walls to create new offices, waiting room, reception area, restrooms, break room, utility room, storage room, and operatory rooms; install new doors, cabinetry; interior finishes per chapter 8 of the 2006 IBC; new plumbing; relocation of existing HVAC diffusers; new power outlets and new lighting. This building was fire sprinklered for building area increase. Any alterations or modifications to the sprinkler system will require a separate permit and shall be per NFPA #13 as regulated by the fire department. No work is planned to effect building common areas or walls. No medical gas is proposed for this space. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  7/19/2010 DONE
Sent to records for scanning.
INSP-Final Inspection7/8/20107/8/20107/8/2010PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in5/26/20105/27/20105/27/2010APASS
DetailsTroy Cobbley
The wood bracing has been covered with dry wall. The items have been corrected. The sprinkler piping can be covered.
INSP-Sprinkler Rough-in5/24/20105/24/20105/24/2010PPART
DetailsTroy Cobbley
There are two locations where there are two sprinkler pendants piped from the same 1" outlet which is not allowed. One pendant was missed being plunged and another exceeds 9' off of the single wall allowed. Also there are four rooms where wood framing/beams have been installed above the ceilings which can be covered with dry wall or replaced with fire treated wood. I discussed this with Don and Matt. Ceiling tile can be installed everywhere except these four rooms.
Issue and Print Permit  5/18/2010 DONE
Plan assigned to (Tim)4/7/2010 4/12/2010 DONE
DetailsTim Frost
4/12/2010 08:42:30 TRF - activity updated through activity FIRA22 from case FIR10-00155.
Sprinkler Plan Check4/12/2010 4/12/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  4/12/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire4/12/2010 4/12/2010 DONE
DetailsPatricia Smith
Telephone call  4/12/2010 DONE
left vm for don at ###-#### - permit ready and fees given
Permit Ready to Issue  4/12/2010 DONE
Details
Telephone call  4/9/2010 DONE
Details
t/c w don at ###-#### - permit denied - needs to be picked up and resubmitted
Plan resubmittals received  4/9/2010  
DetailsTim Frost
rec'd 2 sets
Sprinkler Plan Check4/8/2010 4/8/2010 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  4/8/2010 DONE
DetailsTim Frost
Miscellaneous action  4/8/2010 DONE
Emailed comments
Application received  4/7/2010