Miscellaneous action | | | 10/26/2010 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 9/22/2010 | 9/23/2010 | 9/23/2010 | A | PASS |
Forrest France
|
|
|
Final walkthrough passed after corrections made while on site. Permit finaled.
|
INSP-Supply line flush | 9/1/2010 | 9/2/2010 | 9/2/2010 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in | 9/1/2010 | 9/1/2010 | 9/1/2010 | P | PART |
Forrest France
|
|
|
Scheduled underground flush for the dedicated service supply line.
|
INSP-Sprinkler Rough-in | 6/4/2010 | 6/7/2010 | 6/7/2010 | A | PART |
Forrest France
|
|
|
Noted correction items field verified for completion, rough-in passed, okayed overhead cover. Contractor to be aware of possible light fixture obstructions that may occur due to type/proximity of appliances installed.
|
INSP-Sprinkler Rough-in | 6/2/2010 | 6/2/2010 | 6/2/2010 | P | FAIL |
Forrest France
|
|
|
Correction items include one obstructed head at room 205 first floor, sheetmetal impingement at a branchline in the hallway first floor, beam obstruction at the basement, overspaced head under the stairway to the basement, noted field modifications to be shown on plans including relocated branchlines and dry sw feeds. See plan annotations for locations marked today.
|
Issue and Print Permit | | | 4/23/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/21/2010 | | |
Tim Frost
|
|
|
rec'd 3 sets
|
Sprinkler Plan Check | 4/21/2010 | | 4/21/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 4/21/2010 | | 4/21/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 4/21/2010 | | DONE |
|
|
|
t/c w mick at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 4/21/2010 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 4/9/2010 | | 4/13/2010 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/13/2010 | | 4/13/2010 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 4/13/2010 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 4/13/2010 | | DONE |
|
|
|
Emailed comments
|
Telephone call | | | 4/13/2010 | | DONE |
|
|
|
t/c w mick at ###-#### - permit denied - needs to be picked up and resubmitted
|
Application received | | | 4/9/2010 | | |
|
|
|
|
Pending Assignment by SAM | 4/9/2010 | | 4/9/2010 | | DONE |
Alexandra L. DeYoung
|
|
|
4/9/2010 16:20:36 ALR - activity updated through activity FIRA158 from case FIR10-00165.
|