Miscellaneous action | | | 7/19/2010 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 6/11/2010 | 6/11/2010 | 6/11/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 6/9/2010 | 6/10/2010 | 6/10/2010 | A | FAIL |
Troy Cobbley
|
|
|
I left two messages on Lonnie's voice mail and went to the job site but did not make contact. No inspection was performed and will need to be recalled.
|
INSP-Sprinkler Rough-in | 6/3/2010 | 6/3/2010 | 6/3/2010 | P | PASS |
Troy Cobbley
|
|
|
The first floor sprinkler piping is ok to cover. The main piping and feed to the basement has changed locations. I need new drawings and hydraulic calculations that reflect these changes. I let Lonnie know. A re-inspection will be required for this area when the tenting is complete.
|
Plan assigned to (Tim) | 5/5/2010 | | 5/7/2010 | | DONE |
Tim Frost
|
|
|
5/7/2010 11:19:56 TRF - activity updated through activity FIRA22 from case FIR10-00211.
|
Sprinkler Plan Check | 5/7/2010 | | 5/7/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 5/7/2010 | | 5/7/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 5/7/2010 | | DONE |
|
|
|
t/c w jeff anderson at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 5/7/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/7/2010 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/6/2010 | | 5/6/2010 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 5/6/2010 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 5/6/2010 | | DONE |
|
|
|
t/c w jeff anderson at ###-#### - permit denied - needs to be picked up and resubmitted
|
Plan resubmittals received | | | 5/6/2010 | | DONE |
|
|
|
received 3 sets of resubmitted fire plans and applications sent to Tim Frost .
|
Application received | | | 5/5/2010 | | |
|
|
|
|