Miscellaneous action | | | 7/19/2010 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 6/15/2010 | 6/15/2010 | 6/16/2010 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled, inspection passed. Discussed project completion schedule with contact on site.
|
INSP-Sprinkler Rough-in | 5/18/2010 | 5/19/2010 | 5/20/2010 | A | PART |
Forrest France
|
|
|
Overhead rough-in at the sheetrock ceilings is good for cover, noted one small combustible concealed space below the new stairs to be filled entirely with non-combustible insulation to meet exception allowed per NFPA 13.
|
Issue and Print Permit | | | 5/18/2010 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 5/6/2010 | | 5/7/2010 | | DONE |
Tim Frost
|
|
|
5/7/2010 10:16:04 TRF - activity updated through activity FIRA22 from case FIR10-00215.
|
Sprinkler Plan Check | 5/7/2010 | | 5/7/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 5/7/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2010 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 5/7/2010 | | DONE |
|
|
|
t/c don at ###-#### - permit ready and fees given
|
Inspection Record Card- Fire | 5/7/2010 | | 5/7/2010 | | DONE |
Patricia Smith
|
|
|
|
Permit Ready to Issue | | | 5/7/2010 | | DONE |
|
|
|
|
Application received | | | 5/6/2010 | | |
|
|
|
|