Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberFIR10-00236
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 4610 W HILLCREST DR
Project NameHillcrest Country Club Ph II
Customer Number 
ePlanReview 
Description
This project was originally reviewed under permit FIR09-00707. Phase II of this project is being broken out from Phase I for inspection purposes. The review for FIR09-00707 is attached to this review for reference.

- Revised Scope 5/24/2010:-

This project has been separated into two permits to facilitate inspections. However, this review encompasses both phases. Phase I is under permits BLD09-00980 FIR09-00707. Phase II is under permits BLD10-00031, FIR10-00236

Plan Mod Scope:

Adding, four sprinklers to remote area four and one sprinkler to remote area 2. New hydraulics were provided.


Fire Work Scope:

The Fire Sprinkler Scope of work consists of renovating an existing fire protection system to accommodate new wall and ceiling configuration. The existing fire protection system will be extended to provide sprinklers in two new additions. The fire protection consists of above and below protection. There are two levels in this building each level has a separate riser. The construction has been divided into two phase. The entire building is to have fire protection. In most of the existing areas, the sprinklers are being changed to quick response type.

Hillcrest Country Club - Phase I Addition and Remodel - Phase I includes remodel of the entire building on the west side of the fire wall, plus 750 square feet on the east side of the fire wall (everything west of grid line S). To demo and remove the structure at the Garden Court areas. To demo and removed most of the interior partitions, ceilings and finishes, except at Mech/Elect Room #124 and the stairways. Demo and remove a large portion of the west exterior wall, planters and exterior stairways. To construct a new 4,150 sq. ft. basement and 3,875 sq. ft., wood framed first floor addition on the west end of the existing club house building. To construct new covered patio and entry areas. To refinish the interior to include new men's and women's lounges, showers, locker rooms and restrooms, new golf shop, fitness area, kitchen and bar/dining area. There is a two-hour, masonry firewall constructed at grid line Q. The area of the Phase I project is 18,900 square feet with a 11,900 square foot basement. This building is fully fire sprinkled. The sprinklers are used for area increase. The area on the west side of the firewall is 18,150 sq. ft. with an 11,900 sq. ft. basement; the area on the east side of the fire wall is 21,710 sq. ft. with a 1,535 sq. ft. basement. This permit is for Phase I of the project only. A separate tenant improvement permit will be required to finish Phase II. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  6/8/2011 DONE
Sent to records for scanning.
INSP-Final Inspection2/8/20112/9/20112/9/2011APASS
DetailsTroy Cobbley
Permit finaled. 200 degree pendants have been provided at the supply diffusers per Rick.
INSP-Sprinkler Rough-in12/22/201012/22/201012/22/2010PPASS
DetailsTroy Cobbley
The remaining sprinkler piping can be covered.
INSP-Sprinkler Rough-in12/8/201012/8/201012/8/2010PPART
DetailsForrest France
Overhead fire sprinkler work at the two window bays and one pendent head at the partition wall storage cubby in the private dining area phase two okayed for ceiling cover.
INSP-Sprinkler Rough-in10/26/201010/27/201010/27/2010APASS
DetailsTroy Cobbley
The sprinkler piping above the private dining area is ok to cover. Coverage has not been provided yet in the accordian wall pocket.
INSP-Sprinkler Rough-in/Hydro10/20/201010/20/201010/20/2010PPASS
DetailsTroy Cobbley
The new drops/arm-overs in the lay-in ceiling tile areas are ok to cover. Also the overhead hydro test of the new sprinkler piping passed.
INSP-Sprinkler Rough-in10/18/201010/18/201010/19/2010PPASS
DetailsTroy Cobbley
Rick provided the insulation behind the beam as discussed. The soffit can be covered. Also the three sprinkler pendants located in the womens restroom are passed.
INSP-Sprinkler Rough-in10/14/201010/14/201010/14/2010PPASS
DetailsTroy Cobbley
Rick and I discussed areas where sprinkler piping could be covered.
INSP-Sprinkler Rough-in10/11/201010/12/201010/12/2010APASS
DetailsTroy Cobbley
Rough-in of the sprinkler piping mostly passed. See the city approved plans for phase II where there are some small areas not yet complete. Insulation needs to be repaired in the existing areas and the insulation needs to be installed in the new areas. I noted atleast two areas created by beams and ducting where additional sprinkler piping will be needed or non-combustible insulation could be added. Insulation will need to be verified prior to a approval for cover being given.
INSP-Final Inspection7/8/20107/12/20107/12/2010AFAIL
DetailsTroy Cobbley
the forward flush test failed again
Plan assigned to (Tim)5/21/2010 5/24/2010 DONE
DetailsTim Frost
5/24/2010 10:43:08 TRF - activity updated through activity FIRA22 from case FIR10-00236.
Sprinkler Plan Check5/24/2010 5/24/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS TAKEN FRONT DESK ALARM  5/24/2010 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  5/24/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire5/24/2010 5/24/2010 DONE
DetailsPatricia Smith
Telephone call  5/24/2010 DONE
t/c w jeff at ###-#### - permit ready and fees given
Permit Ready to Issue  5/24/2010 DONE
Details
Issue and Print Permit  5/24/2010 DONE
Application received  5/21/2010  
Pending Assignment by SAM5/21/2010 5/21/2010 DONE
DetailsAlexandra L. DeYoung
5/21/2010 14:11:24 ALR - activity updated through activity FIRA158 from case FIR10-00236.