Miscellaneous action | | | 9/8/2010 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 7/19/2010 | 7/21/2010 | 7/21/2010 | A | PASS |
Forrest France
|
|
|
Site inspection passed, permit final okayed.
|
INSP-Conference | 7/20/2010 | 7/20/2010 | 7/20/2010 | A | DONE |
Forrest France
|
|
|
Regarding site acceptance testing and inspection schedule.
|
Issue and Print Permit | | | 7/14/2010 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/28/2010 | | 6/28/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 6/28/2010 | | 6/28/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 6/28/2010 | | DONE |
|
|
|
t/c w sharon at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/28/2010 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/28/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/25/2010 | | DONE |
Tim Frost
|
|
|
recd'd 3 sets
|
Plan resubmittals received | | | 6/21/2010 | | |
Tim Frost
|
|
|
rec'd 3 sets
|
Sprinkler Plan Check | 6/21/2010 | | 6/21/2010 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
Miscellaneous action | | | 6/21/2010 | | DONE |
|
|
|
Emailed contractor review
|
Telephone call | | | 6/21/2010 | | |
Barbara Stitt
|
|
|
Called and told Seth that plans were denied and need picked up and re-submitted on 6-21-10 @ 2:30pm BAS
|
Sprinkler Plan Check | 6/14/2010 | | 6/14/2010 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 6/14/2010 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/14/2010 | | DONE |
|
|
|
Emailed comment to Fire Protection contractor
|
Telephone call | | | 6/14/2010 | | DONE |
|
|
|
left message for rob at ###-#### - permit denied - needs to be picked up and resubmitted
|
Telephone call | | | 6/11/2010 | | DONE |
|
|
|
Called Roy at Orr Protection Systems to ask about the drawings. He says new nozzles and new disconnects.
I need calculations, nozzle submittal.
|
Telephone call | | | 6/11/2010 | | DONE |
|
|
|
Called Ball Fire Protection. Suppose to call back.
Has the panel been moved or changed?
|
Miscellaneous action | | | 6/9/2010 | | DONE |
|
|
|
Submitted as a fire alarm application by mistake. Should be a sprinkler permit application.
|
Plan assigned to (Tim) | 6/9/2010 | | 6/9/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Application received | | | 6/8/2010 | | |
|
|
|
|