Miscellaneous action | | | 9/8/2010 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 8/19/2010 | 8/20/2010 | 8/20/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Plan assigned to (Tim) | 8/9/2010 | | 8/10/2010 | | DONE |
Tim Frost
|
|
|
8/10/2010 08:42:05 TRF - activity updated through activity FIRA22 from case FIR10-00262.
|
Sprinkler Plan Check | 8/10/2010 | | 8/10/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 8/10/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 8/10/2010 | | 8/10/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 8/10/2010 | | DONE |
|
|
|
t/c w jim at ###-#### - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 8/10/2010 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/10/2010 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/10/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/9/2010 | | |
Tim Frost
|
|
|
rec'd 3 copies
|
Miscellaneous action | | | 8/5/2010 | | DONE |
|
|
|
Received an email from Treasure Valley Fire Protection that was forwarded from Riley Mahaffey P.E., LEED Green Associate indicating load splitter will not be required since the fire protection will be hung with only 2 hangers per truss. The mains will be hung to the outside walls.
|
Telephone call | | | 8/5/2010 | | DONE |
|
|
|
Per a phone call by Jim Darr at Treasure Valley Fire Protection this project is on hold pending revised drawings.
|
INSP-Sprinkler Rough-in/Hydro | 8/4/2010 | 8/4/2010 | 8/4/2010 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed.
|
Plan resubmittals received | | | 8/4/2010 | | DONE |
|
|
|
received 3 sets of plans / applications sent to Tim Frost
|
INSP-Sprinkler Rough-in | 8/2/2010 | 8/2/2010 | 8/2/2010 | P | PASS |
Troy Cobbley
|
|
|
Todays inspection verified sprinkler deflector distance from the deck, ESFR sprinkler SIN numbers and branchline hangers. Still need to complete the inspection on the riser, hydro tests...ect. Also needed are the main hangers "load splitters" addressed as per tim frost.
|
INSP-Sprinkler Rough-in/Hydro | 7/29/2010 | 7/30/2010 | 7/30/2010 | A | CANC |
Troy Cobbley
|
|
|
justin Phone #: ###-####//cancelled per Justin 7/30 @ 7:18am
|
INSP-Sprinkler Rough-in | 7/29/2010 | 7/29/2010 | 7/29/2010 | P | PART |
Troy Cobbley
|
|
|
The offices 100, 102, 103 and 104 are actually being used for storage of paintings. These areas will need to be addressed as Ordinary Hazard. Also per the fitter the ceilings in these same areas are not going to be installed. Resubmittals will be required. That being said the sprinkler piping can be covered. All of the overhead sprinkler piping was inspected today and passed except a lift will not be available until next week to verify heads, distances from the deck and hangers. There are still hanger issues being addressed by the plan reviewer and Treasure Valley Fire. So hangers and sway bracing has not been inspected yet. Insulation neeeds to be installed at the deck as discussed above the upper mezzanine offices and the insulation that is hanging down in the warehouse needs to be repaired.
|
INSP-Supply line flush | 7/9/2010 | 7/9/2010 | 7/9/2010 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 7/8/2010 | 7/9/2010 | 7/9/2010 | A | PART |
Forrest France
|
|
|
Underground fire supply line hydrostatic test passed.
|
INSP-Sprinkler Rough-in | 7/7/2010 | 7/7/2010 | 7/7/2010 | P | PASS |
Troy Cobbley
|
|
|
The underground stub-in is ok for cover.
|
Miscellaneous action | | | 6/16/2010 | | DONE |
|
|
|
Sent the following email to Ron Steinquist and Jim Darr at Treasure Valley Fire Protection
Ron, Jim
I received a return letter from my inquiry regarding the structural loading on this project. It appears that Ron was involved with Lochsa Engineering during the evaluation and therefore knows of my concerns. Jim has shown a number of different hangers on his drawing. One of the hanger uses the Afcon 770 bracket which will be attached to the wall. According, to the engineering analysis the mains MUST be hung from the wall not off of the trusses. Please, submit manufacture's data sheets of this hanger and fasteners for review (They may be emailed). In addition, it appears that "load splitters" are required to be installed. This is obviously not in your contract. However, the field inspector will not be able to final the sprinkler installation without these members installed. Therefore, please, coordinate with the party to whom you are working for on this project.
Should you have any questions please feel free to contact me.
|
Plan assigned to (Tim) | 6/8/2010 | | 6/11/2010 | | DONE |
Tim Frost
|
|
|
6/11/2010 10:38:31 TRF - activity updated through activity FIRA22 from case FIR10-00262.
|
Sprinkler Plan Check | 6/11/2010 | | 6/11/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 6/11/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 6/11/2010 | | 6/11/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 6/11/2010 | | DONE |
|
|
|
t/c w jim darr at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/11/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/11/2010 | | DONE |
|
|
|
|
Application received | | | 6/8/2010 | | |
|
|
|
|
Pending Assignment by SAM | 6/8/2010 | | 6/8/2010 | | DONE |
Alexandra L. DeYoung
|
|
|
6/8/2010 15:54:41 ALR - activity updated through activity FIRA158 from case FIR10-00262.
|