INSP-Final Inspection | 2/28/2011 | 3/1/2011 | 3/1/2011 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 2/25/2011 | 2/25/2011 | 2/25/2011 | P | FAIL |
Troy Cobbley
|
|
|
Provide as-builts and map for the facp with the correct device addressing.
|
INSP-Final Inspection | 2/23/2011 | 2/23/2011 | 2/23/2011 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was for placement of notification devices and testing of the duct smoke detectors. See the city approved plans for locations where a/v's in the kitchen have been mounted too high. A weather proof a/v will be required in the Dish Washing room. The two abandoned manual pull stations in the Kitchen will need to be removed. EOL voltages will need to be verified especially since some of the strobes have been set at brighter setting than is required. Testing of the duct smoke detectors passed with minor modifications/repairs while I waited. Remote indicators will be required at all of the duct smoke detectors that have been installed on the same circuit. This includes the phase I devices. As-builts are required showing the new circuitry and a map provide for the FACP.
|
CHANGE STATUS TO (ISS) | | | 2/23/2011 | | DONE |
Tisha Gallop
|
|
|
change status to issued per Troy Cobbley
|
Miscellaneous action | | | 7/28/2010 | | DONE |
|
|
|
FA plans taken to records for scanning.
|
INSP-Final Inspection | 6/25/2010 | 6/28/2010 | 6/28/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. This is the phase I portion of the project.
|
INSP-Final Inspection | 6/24/2010 | 6/24/2010 | 6/24/2010 | A | DEFR |
Forrest France
|
|
|
Contact: Rob Ahten - system has been tested, needs to be signed off Inspection requested from web by: Deb Gooden Phone #: ###-####
|
Inspection Record Card- Fire | 6/23/2010 | | 6/23/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 6/23/2010 | | DONE |
|
|
|
left vm for phil at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/23/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/23/2010 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 6/10/2010 | | 6/22/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
6/22/2010 14:20:36 SLC - activity updated through activity FIRA24 from case FIR10-00274.
|
1st review completed | | | 6/22/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 6/22/2010 | | 6/22/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
Approved - see redlines
|
PLANS TAKEN FRONT DESK ALARM | | | 6/22/2010 | | DONE |
|
|
|
Approved plans available at front counter
|
Telephone call | | | 6/16/2010 | | DONE |
|
|
|
Spoke to Phil Bassick regarding a conflict in the permit application I asked if he could clarify. I let him know the application was for phase 1 fire alarm but was associated with phase 2 building permit. He asked me to please wait until next week when Rob (Ahten) was back from Vacation, that it would be him that needs to clear it up.
|
Application received | | | 6/10/2010 | | |
|
|
|
|