Miscellaneous action | | | 7/28/2010 | | DONE |
|
|
|
FA plans taken to records for scanning.
|
INSP-Final Inspection | 7/8/2010 | 7/9/2010 | 7/9/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/7/2010 | 7/8/2010 | 7/8/2010 | A | FAIL |
Troy Cobbley
|
|
|
All devices were tested but the duct detectors have been wired to a single zone instead of the three individual zones per the approved plans. I waited on site while the alarm installer tried to get things changed but when we tested the duct on zone 6 the hvac unit did not shut down. The inspection was stopped. All duct smoke detectors will need to be retested to verify shutdown and correct zone labeling/monitoring and a signal report will need to be provided. A map at the FACP is required as well.
|
Plan assigned to (Stephanie) | 6/30/2010 | | 7/6/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
7/6/2010 11:12:16 SLC - activity updated through activity FIRA24 from case FIR10-00303.
|
1st review completed | | | 7/6/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 7/6/2010 | | 7/6/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
plans approved with review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 7/6/2010 | | DONE |
|
|
|
Approved plans available at front counter
|
Inspection Record Card- Fire | 7/6/2010 | | 7/6/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 7/6/2010 | | DONE |
|
|
|
t/c w lori at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/6/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/6/2010 | | DONE |
|
|
|
|
Application received | | | 6/30/2010 | | |
|
|
|
|