Miscellaneous action | | | 9/8/2010 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 7/27/2010 | 7/27/2010 | 7/27/2010 | P | PASS |
Forrest France
|
|
|
Final walkthrough completed satisfactory. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 7/13/2010 | 7/14/2010 | 7/15/2010 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler system modifications per the scope of remodel are good for cover at the drop ceilings.
|
Issue and Print Permit | | | 7/12/2010 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/2/2010 | | 7/9/2010 | | DONE |
Tim Frost
|
|
|
7/9/2010 13:01:52 TRF - activity updated through activity FIRA22 from case FIR10-00310.
|
Sprinkler Plan Check | 7/9/2010 | | 7/9/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/9/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/9/2010 | | 7/9/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 7/9/2010 | | DONE |
|
|
|
left vm for jim at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/9/2010 | | DONE |
|
|
|
|
Application received | | | 7/2/2010 | | |
|
|
|
|