Telephone call | | | 9/20/2010 | | DONE |
|
|
|
FA plans taken to records for scanning.
|
INSP-Final Inspection | 9/9/2010 | 9/9/2010 | 9/9/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Issue and Print Permit | | | 9/9/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 9/7/2010 | | 9/7/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
2nd Plan modification approved
|
PLANS TAKEN FRONT DESK ALARM | | | 9/7/2010 | | DONE |
|
|
|
2nd Plan modification approved documents available at front counter
|
Inspection Record Card- Fire | 9/7/2010 | | 9/7/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/7/2010 | | DONE |
|
|
|
t/c w rose at ###-#### - permit (plan mod #2) ready and fees given
|
Permit Ready to Issue | | | 9/7/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/1/2010 | | DONE |
|
|
|
received 2 sets of plans and 1 application.sent to Stephanie Cobbley for review. ///dld
|
INSP-Final Inspection | 8/27/2010 | 8/30/2010 | 8/30/2010 | A | FAIL |
Troy Cobbley
|
|
|
Provide one additional smoke detector in the ceiling pocket outside of the conference room. Also the EOL did not meet the minimum 19.6 volts. It appears that the notification circuit wil need to be split. This modification will require a resubmittal. Also the horns did not sync.
|
Plan resubmittals received | | | 8/27/2010 | | |
Stephanie L. Cobbley
|
|
|
rec'd 2 sets
|
Alarm Plan Check | 8/27/2010 | | 8/27/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved
|
PLANS TAKEN FRONT DESK ALARM | | | 8/27/2010 | | DONE |
|
|
|
Approved plan modification documents available at front counter
|
Permit Ready to Issue | | | 8/27/2010 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 8/27/2010 | | 8/27/2010 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 8/27/2010 | | DONE |
Barbara Stitt
|
|
|
Left voice message for Bret Anderson that permit is ready & fees due 8-27-10 @ 1:30pm
|
Issue and Print Permit | | | 8/27/2010 | | |
|
|
|
|
INSP-Final Inspection | 8/25/2010 | 8/26/2010 | 8/26/2010 | A | FAIL |
Troy Cobbley
|
|
|
The audio/visual devices are mounted too low. Need to test the a/v's and the smoke detectors. The tamper switch and flow switch were verified.
|
INSP-Final Inspection | 8/25/2010 | 8/25/2010 | 8/25/2010 | P | CANC |
Troy Cobbley
|
|
|
Per Chris Farnsworth the hvac units were not shutting down upon activation of the duct smoke detectors. Inspection to be rescheduled for tomorrow morning.
|
Issue and Print Permit | | | 8/6/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 8/5/2010 | | 8/5/2010 | | PASS |
Stephanie L. Cobbley
|
|
|
approved - see redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 8/5/2010 | | DONE |
|
|
|
Approved redlined plans available at front counter
|
Inspection Record Card- Fire | 8/5/2010 | | 8/5/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 8/5/2010 | | DONE |
|
|
|
Spoke with Bret w/ Mountain Alarm regarding an added access control system. He stated it will be tied in to the alarm panel via an existing on-board relay. I let him know that this will be acceptable provided he has a set of printed as-builts available at the final inspection including implementation of review comments/redlines.
|
Telephone call | | | 8/5/2010 | | DONE |
|
|
|
t/c w diane at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 8/5/2010 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 7/14/2010 | | 8/5/2010 | | DONE |
Stephanie L. Cobbley
|
|
|
8/5/2010 15:46:38 SLC - activity updated through activity FIRA24 from case FIR10-00336.
|
Plan resubmittals received | | | 8/2/2010 | | |
Stephanie L. Cobbley
|
|
|
rec'd 2 sets
|
1st review completed | | | 7/27/2010 | | DONE |
|
|
|
|
Alarm Plan Check | 7/27/2010 | | 7/27/2010 | | FAIL |
Stephanie L. Cobbley
|
|
|
see redlines and review comments
|
Telephone call | | | 7/27/2010 | | DONE |
|
|
|
Spoke to Bret regarding the discrepencies in the plans. He indicated they were engineered drawings. I let him know that he would need to list the engineer as the designer if that was the case and not his employee. I also reminded him that since these were done by an engineer, the shop drawings would need to be reviewed by the engineer. The engineer will need to either stamp the shop drawings or provide a letter indicating he/she has reviewed the drawings and they meet the design intent. I let Bret know I would need to deny the plans due to this.
|
Miscellaneous action | | | 7/27/2010 | | DONE |
|
|
|
Faxed review comments to contractor
|
Miscellaneous action | | | 7/27/2010 | | DONE |
|
|
|
denied plans available at front counter for customer pick up
|
Plan resubmittals received | | | 7/15/2010 | | DONE |
Tisha Gallop
|
|
|
received two sets of plans; taken to Stephanie Cobbley
|
Application received | | | 7/14/2010 | | |
|
|
|
|