Miscellaneous action | | | 1/14/2011 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 11/19/2010 | 11/19/2010 | 11/19/2010 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
CHANGE STATUS TO (ISS) | | | 11/19/2010 | | DONE |
|
|
|
changed to issue status per trf
|
Miscellaneous action | | | 11/16/2010 | | DONE |
|
|
|
Received as built drawings. The only change was, changing the sprinklers in the two bedrooms to Tyco LFII. This was necessitated due to information regarding where the pump was set to only produce 40 GPM.
|
Plan resubmittals received | | | 11/12/2010 | | DONE |
Tisha Gallop
|
|
|
Plan Modification: Received three copies of application, submittal documents and plans; routed to fire review.
|
INSP-Final Inspection | 11/8/2010 | 11/8/2010 | 11/8/2010 | P | FAIL |
Troy Cobbley
|
|
|
The testing of the bell passed. We are now waiting on a letter from the pump provider verifying that the correct gpm and psi has been provided. The letter will be sent to Tim Frost for verification prior to setting up another final inspection.
|
INSP-Final Inspection | 11/1/2010 | 11/2/2010 | 11/2/2010 | A | FAIL |
Troy Cobbley
|
|
|
The inspector's test has not been set up to verify note "B" of the review comments. (two heads for 7 minutes). All other items appear ok.
|
INSP-Final Inspection | 11/1/2010 | 11/1/2010 | 11/1/2010 | P | CANC |
Troy Cobbley
|
|
|
Lonnie and my schedules did not meet. Rescheduled for tomorrow.
|
INSP-Sprinkler Rough-in | 8/31/2010 | 9/1/2010 | 9/1/2010 | A | PASS |
Troy Cobbley
|
|
|
The added pendants/piping, due to ceiling obstructions, is ok for cover.
|
INSP-Sprinkler Rough-in | 8/26/2010 | 8/26/2010 | 8/26/2010 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover. Per Lonnie and I's conversation, 8" lintels will be installed at the shower/soffit to avoid instlling sprinkler pendants in the showers.
|
Issue and Print Permit | | | 7/19/2010 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/14/2010 | | 7/16/2010 | | DONE |
Tim Frost
|
|
|
7/16/2010 13:35:13 TRF - activity updated through activity FIRA22 from case FIR10-00339.
|
Sprinkler Plan Check | 7/16/2010 | | 7/16/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/16/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/16/2010 | | 7/16/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 7/16/2010 | | DONE |
|
|
|
left vm for jeff at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/16/2010 | | DONE |
|
|
|
|
Miscellaneous action | | | 7/15/2010 | | DONE |
|
|
|
Spoke to the contractor and asked him to provided documentation that well can supply the 40 Gpm @ 60 Psi for 7 minutes.
The project is on hold until the documentation is supplied.
|
Application received | | | 7/14/2010 | | |
|
|
|
|
Pending Assignment by SAM | 7/14/2010 | | 7/14/2010 | | DONE |
Alexandra L. DeYoung
|
|
|
7/14/2010 16:21:13 ALR - activity updated through activity FIRA158 from case FIR10-00339.
|