Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR10-00342
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 8233 W FRANKLIN RD
Project NameCafe Rio
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of a new wet system and antifreeze system to protect a portion of the building. This space is separated from the adjoining space by a fire barrier. The system is supplied by 6" C-900 underground piping through a 3" RPZ backflow preventer to a 3" riser and 2½" main. The branch lines are telescoping. The space has a small antifreeze system protecting the exterior canopy. The system has quick response standard spacing sprinklers.

Partial fire sprinkler system required for fire area occupant load. To remodel an existing 2,580 square foot tenant space and convert it to a restaurant with a kitchen. Work it to include 2 restrooms accessible to the disabled, interior nonbearing walls, four (4) Type I grease hoods, one (1) Type II hood, interior decorative canopies, a suspended decorative log ceiling element, suspended acoustical ceilings, structural work to support new roof top equipment (concrete footings, steel and wood columns, steel and wood beams, etc.), kitchen equipment, a grease trap, and finishes. Transfer blocks and bottom cord sleepers will be added to the existing roof trusses as part of the structural modifications needed to support hoods and new roof top equipment. In addition, a 2-hr fire-resistance-rated fire barrier wall will be constructed to completely separate this building, the canopy included, into two separate fire areas. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire area containing this tenant space is required to be fire sprinklered in conjunction with this permit. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Interior nonstructural demolition was done under permit BLD10-01546. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  10/26/2010 DONE
Sent to records for scanning.
INSP-Final Inspection9/8/20109/9/20109/9/2010APASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection9/7/20109/8/20109/9/2010AFAIL
DetailsTroy Cobbley
Waiting for the project related fire alarm permit to be passed.
INSP-Sprinkler Rough-in/Hydro9/7/20109/8/20109/8/2010APASS
DetailsTroy Cobbley
Overhead hydro test and forward flush passed.
INSP-Sprinkler Rough-in8/25/20108/26/20108/26/2010APASS
DetailsTroy Cobbley
The sprinkler piping in the drop ceiling areas can be covered.
INSP-Supply line flush8/23/20108/24/20108/24/2010APASS
DetailsTroy Cobbley
The underground supply line flush passed inspection.
INSP-Supply line flush8/19/20108/20/20108/20/2010PFAIL
DetailsTroy Cobbley
United water didnt unlock the valve again. No flushing performed.
INSP-Supply line flush8/18/20108/19/20108/19/2010PFAIL
DetailsTroy Cobbley
The underground had not been unlocked/turned on by United Water. No flushing was performed.
INSP-Sprinkler Rough-in/Hydro8/13/20108/17/20108/17/2010PPART
DetailsForrest France
Overhead hydrostatic test of the new antifreeze system passed.
INSP-Sprinkler Rough-in/Hydro8/12/20108/13/20108/13/2010PPART
DetailsTroy Cobbley
A partial rough-in was performed. The riser has not been built and arm overs/drops have not been installed yet. Pipe routing has been changed in the remote areas but after confering with Tim Frost resubmittals will not be required. See the city approved plans for locations of deficiencies as marked in red.
INSP-Supply line flush8/12/20108/13/20108/13/2010PCANC
DetailsTroy Cobbley
Water has not been turned on to site yet so no flush was performed.
INSP-Sprinkler Rough-in8/12/20108/13/20108/12/2010PCANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by John Venche Inspection cancelled from web by: John Venche
INSP-Sprinkler Rough-in/Hydro8/5/20108/6/20108/6/2010APASS
DetailsTroy Cobbley
The underground supply line is ok to cover. The two 45 degree fittings have now been rodded.
Issue and Print Permit  7/28/2010  
Plan assigned to (Tim)7/23/2010 7/27/2010 DONE
DetailsTim Frost
7/27/2010 10:53:36 TRF - activity updated through activity FIRA22 from case FIR10-00342.
Sprinkler Plan Check7/27/2010 7/27/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  7/27/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire7/27/2010 7/27/2010 DONE
DetailsPatricia Smith
Telephone call  7/27/2010 DONE
left vm for john at ###-#### - permit ready and fees given
Permit Ready to Issue  7/27/2010 DONE
Details
Plan assigned to (Tim)7/16/2010 7/27/2010 DONE
DetailsTim Frost
7/27/2010 10:53:36 TRF - activity updated through activity FIRA22 from case FIR10-00342.
Plan resubmittals received  7/26/2010  
DetailsTim Frost
rec'd 3 sets
Telephone call  7/23/2010 DONE
left message w clarence at ###-#### - permit denied - needs to be picked up and resubmitted
Plan resubmittals received  7/22/2010 DONE
received 3 resubmittal plans and apps sent to Tim F
Sprinkler Plan Check7/20/2010 7/20/2010 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  7/20/2010 DONE
DetailsTim Frost
Miscellaneous action  7/20/2010 DONE
Emailed comments to the contractor
Telephone call  7/20/2010 DONE
t/c w john at ###-#### - permit denied - needs to be picked up and resubmitted
Application received  7/16/2010  
Pending Assignment by SAM7/16/2010 7/16/2010 DONE
DetailsAlexandra L. DeYoung
7/16/2010 14:36:48 ALR - activity updated through activity FIRA158 from case FIR10-00342.