Miscellaneous action | | | 9/8/2010 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 8/12/2010 | 8/13/2010 | 8/13/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 8/12/2010 | 8/12/2010 | 8/12/2010 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 7/28/2010 | 7/29/2010 | 7/29/2010 | A | PASS |
Troy Cobbley
|
|
|
Previous correction notice items have been addressed. All sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 7/27/2010 | 7/28/2010 | 7/28/2010 | A | PART |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover except in the two locations where hangers are required on the arm over piping that exceeds 2' and the one location whre a retaining strap is missing. These items will be verified at the final inspection.
|
INSP-Sprinkler Rough-in/Hydro | 7/26/2010 | 7/27/2010 | 7/27/2010 | A | CANC |
Troy Cobbley
|
|
|
Cover Inspection - Contact: Jeff Chaney Phone #: ###-#### x1234 >> Inspection requested via web by Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
INSP-Sprinkler Rough-in/Hydro | 7/26/2010 | 7/27/2010 | 7/26/2010 | A | CANC |
Troy Cobbley
|
|
|
Cover Inspection - Contact: Jeff Chaney Phone #: ###-#### x1234 >> Inspection requested via web by Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|
Inspection Record Card- Fire | 7/23/2010 | | 7/23/2010 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 7/23/2010 | | DONE |
|
|
|
|
Telephone call | | | 7/23/2010 | | DONE |
|
|
|
Called and told Shaun Ramsey that plans are ready & fees due on 7-23-10 @ 8:25 am
|
Issue and Print Permit | | | 7/23/2010 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/21/2010 | | 7/22/2010 | | DONE |
Tim Frost
|
|
|
7/22/2010 14:34:17 TRF - activity updated through activity FIRA22 from case FIR10-00353.
|
Sprinkler Plan Check | 7/22/2010 | | 7/22/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/22/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2010 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/21/2010 | | |
|
|
|
|