Permit Information
Permit NumberFIR10-00355
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 950 W STATE ST
Project NameFirst Presbyterian Church TI
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of adding and revising the fire sprinkler protection to a portion of the building. When the fire sprinkler work is completed, the entire building will have fire sprinklers. The work will begin by adding a new backflow preventer and adding fire sprinklers to the eastern end of three levels. The basement fire protection is apparently existing. However, extensive changes are required to the fire sprinkler system. The existing underground piping is 4". The second floor piping will be tented with insulation to prevent freezing. The attic system will be a dry system. Each level will have a floor control valve per BMC. All sprinklers will be quick response type.

Plan Mod 1 Scope:

The plan mod scope of work consists of adding sprinklers to mechanical rooms located in the basement. In addition, the pipe sizes of the existing main in the basement were wrong and have been corrected. Therefore, new hydraulic calculations were needed and have been provided. Only the ballooned areas indicated as PM have been reviewed in this submittal.

________________________________________

Building Department Scope:

Fire sprinklers used for building area increase. To remodel the basement (3,528 square feet), first story (3,528 square feet), and second story (3,528 square feet) of the existing Lindsay Hall portion (East end of building) of the First Presbyterian Church. Work is to include upgrading the restrooms on all 3 stories to be accessible to the disabled, upgrading the enclosure of the East stairway to be 1-hr fire-resistance-rated, constructing interior walls, installing new folding partitions, and creating new openings in an existing masonry wall (steel headers and trimmers). Work also includes exterior windows, doors, suspended acoustical ceilings, interior finishes, and millwork. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. Lindsay Hall will be fully fire sprinklered throughout in conjunction with this permit. The fire sprinkler system of the entire First Presbyterian Church building is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  6/8/2011 DONE
Sent to records for scanning.
INSP-Final Inspection3/17/20113/18/20113/18/2011APASS
DetailsForrest France
C/N items completed. Inspection passed. Fire sprinkler permit finaled.
INSP-Final Inspection3/15/20113/17/20113/17/2011APART
DetailsForrest France
Verified dry system pressure switch and outside bell operations. Need to complete forward flow test per last inspection notes dated 2/14 and per plan review revision notes item #1 dated 8/11/10. Missing automatic air maintenance device per NFPA 13 7.2.6.5.1 or meet sec. 7.2.6.5.2.
INSP-Final Inspection3/14/20113/15/20113/15/2011ADEFR
DetailsForrest France
We will be there for the 7:30am final. Ken is the
contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
INSP-Final Inspection2/9/20112/14/20112/14/2011APART
DetailsForrest France
Final pending program change for the dry system pressure switch at the FACP and outside bell connection. Walkthrough passed, trip testing completed okay. Need to forward flow the DCVA.
INSP-Final Inspection2/2/20112/3/20112/3/2011ACANC
DetailsForrest France
Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Final Inspection2/2/20112/4/20112/2/2011ACANC
DetailsForrest France
Mike B is the contact. We understand this is scheduled for 7:30 am. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Final Inspection2/2/20112/3/20112/2/2011ACANC
DetailsForrest France
Mike B is the contact. We understand this is
scheduled for 7:30am Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro1/31/20112/1/20112/1/2011PPART
DetailsForrest France
Concluded satisfactory 24 hr. pneumatic test of the dry system within allowable leakage per NFPA 13.
INSP-Sprinkler Rough-in1/28/20111/31/20111/31/2011PPART
DetailsForrest France
Begin 24 hr. air test of the new dry system 12:30 PM @45psig.
INSP-Final Inspection1/26/20111/28/20111/28/2011ANR
DetailsForrest France
Need to complete 24 hr. air test of the new dry system per NFPA 13 2007 24.2.2.1
INSP-Conference1/6/20111/6/20111/11/2011PDONE
DetailsForrest France
INSP-Sprinkler Rough-in/Hydro1/6/20111/7/20111/10/2011APART
DetailsForrest France
Overhead hydrostatic test for the new first floor system only, passed.
INSP-Sprinkler Rough-in12/16/201012/17/201012/17/2010PPART
DetailsForrest France
Correction items at the first floor per last inspection completed- okay to cover with the exception of the kitchen area grid ceilings incomplete at this time.
INSP-Sprinkler Rough-in12/6/201012/6/201012/6/2010PFAIL
DetailsForrest France
Rough-in inspection for the 1st floor completed- Noted exposed combustible construction lacking coverage at the open area south end, need to maintain 130 ft2 max spacing at the kitchen, field modifications in branchline routing at the east entry vestibule need to be installed per plan or proved by new calcs as five heads are now fed from a single 1" outlet. See redline areas on plan set for locations. Note: okay to cover remainder of installation.
Telephone call  11/29/2010 DONE
Telephone call with the architect Matt Reese.

He asked if he could not sprinkler a walkway that serves two rooms in Lindsey Hall addition since the walkway attaches to the central building. The walkway is the only means of eggress from the two rooms. I check with the fire inspector (Forest France) and he said it was geater than 4' and is of combustible construction. The central building was apparently sprinkler under BLD97-01561 utilizing the 1994 UBC. I reviewed NFPA 13 1994 under section 4-5.7.2 and any combustible canopy over 4' required fire protection. I informed Matt Reese since this was the only means of eggress that I wanted fire protection below the canopy.
INSP-Sprinkler Rough-in/Hydro11/4/201011/4/201011/4/2010APART
DetailsForrest France
Dry system hydro passed.
INSP-Sprinkler Rough-in/Hydro11/2/201011/3/201011/3/2010PPART
DetailsForrest France
Overhead hydrostatic test of the new dry system passed.
INSP-Sprinkler Rough-in10/19/201010/21/201010/22/2010APART
DetailsForrest France
Corrections at the second floor okayed for cover.
INSP-Sprinkler Rough-in10/18/201010/18/201010/18/2010PFAIL
DetailsForrest France
See inspection notes on stamped plan dated 9/17- provide coverage at two pockets, min. spacing at two pendent heads in the corrdior is exceeded.
INSP-Sprinkler Rough-in10/18/201010/18/201010/18/2010APART
DetailsForrest France
Okay to cover basement level overhead fire sprinkler install.
INSP-Sprinkler Rough-in10/15/201010/15/201010/15/2010PPART
DetailsForrest France
Re-inspection for relocated head in the basement okayed.
INSP-Sprinkler Rough-in10/7/201010/8/201010/8/2010APART
DetailsForrest France
See plans for locations red-lined with today's inspection notes.
INSP-Sprinkler Rough-in10/7/201010/8/201010/7/2010ACANC
DetailsForrest France
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
Issue and Print Permit  10/7/2010 DONE
DetailsBarbara Stitt
Plan resubmittals received  9/28/2010 DONE
DetailsTisha Gallop
Plan Modification: Recieved three copies of application, submittal documents and plans; taken to Fire Review
Plan assigned to (Tim)9/28/2010 9/28/2010 DONE
DetailsTim Frost
9/28/2010 14:53:44 TRF - activity updated through activity FIRA22 from case FIR10-00355.
Sprinkler Plan Check9/28/2010 9/28/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  9/28/2010 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  9/28/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire9/28/2010 9/28/2010 DONE
DetailsPatricia Smith
Telephone call  9/28/2010 DONE
t/c w cameron at ###-#### - permit (plan mod) ready and fees given
Permit Ready to Issue  9/28/2010 DONE
Details
INSP-Sprinkler Rough-in/Hydro9/16/20109/17/20109/17/2010APART
DetailsTroy Cobbley
The rough-in for the basement was stopped after it was found that the 3" sch. 10 main as shown on the city approved plans was not installed. The 2nd floor dry and wet system rough-in inspection passed except as noted in red on the city approved plans and the piping can be covered. The overhead hydro on dry system failed due to a drop from 212 psi to 208 psi after two hours.
INSP-Sprinkler Rough-in/Hydro9/9/20109/10/20109/10/2010PPART
DetailsForrest France
Overhead hydrostatic test of the wet system riser adjacent to the dry valve passed.
INSP-Sprinkler Rough-in8/13/20108/16/20108/16/2010APART
DetailsForrest France
Overhead work at two restrooms basement level as initialed and annotated with today's date are okay for ceiling cover.
Issue and Print Permit  8/12/2010 DONE
Sprinkler Plan Check8/11/2010 8/11/2010 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  8/11/2010 DONE
DetailsTim Frost
Inspection Record Card- Fire8/11/2010 8/11/2010 DONE
DetailsPatricia Smith
Telephone call  8/11/2010 DONE
left vm for cameron at ###-#### - permit ready and fees given
Permit Ready to Issue  8/11/2010 DONE
Details
Plan assigned to (Tim)7/21/2010 8/11/2010 DONE
DetailsTim Frost
8/11/2010 14:26:33 TRF - activity updated through activity FIRA22 from case FIR10-00355.
Plan resubmittals received  8/10/2010  
DetailsTim Frost
rec'd 3 sets
Plan resubmittals received  8/4/2010 DONE
received 3 sets of plans and 1 application/submittal checklist sent to Tim Frost.
Sprinkler Plan Check8/4/2010 8/4/2010 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Telephone call  8/4/2010 DONE
t/c w cameron at ###-#### - permit denied - needs to be picked up and resubmitted
Sprinkler Plan Check7/22/2010 7/22/2010 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  7/22/2010 DONE
DetailsTim Frost
Miscellaneous action  7/22/2010 DONE
Emailed review to contractor
Telephone call  7/22/2010 DONE
Left voice message for Cameron Hess that plans were denied on 7-22-10 @ 2:15pm
Application received  7/21/2010