Miscellaneous action | | | 10/26/2010 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 9/29/2010 | 9/30/2010 | 9/30/2010 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed walkthrough. Pemit final approved.
|
INSP-Final Inspection | 9/24/2010 | 9/24/2010 | 9/24/2010 | P | NR |
Forrest France
|
|
|
Pendent sprinkler heads at various locations are missing escutcheons and drop ceiling tile.
|
INSP-Sprinkler Rough-in/Hydro | 8/23/2010 | 8/23/2010 | 8/23/2010 | A | PART |
Forrest France
|
|
|
Overhead work approved for cover.
|
INSP-Sprinkler Rough-in | 8/20/2010 | 8/20/2010 | 8/20/2010 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler system modifications at the 1st floor are approved for cover at the drop ceilings.
|
Sprinkler Plan Check | 7/23/2010 | | 7/23/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/23/2010 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2010 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/23/2010 | | 7/23/2010 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 7/23/2010 | | DONE |
|
|
|
t/c w mike at ###-#### - permit rady and fees given
|
Permit Ready to Issue | | | 7/23/2010 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/23/2010 | | DONE |
|
|
|
|
Application received | | | 7/21/2010 | | |
|
|
|
|
Pending Assignment by SAM | 7/21/2010 | | | | |
|
|
|
|